Siemens Tecnomatix - Simulation Aided Scheduling Tool for Reconfigurable Assembly System

Suljettu Julkaistu 2 vuotta sitten Maksettu toimituksen yhteydessä
Suljettu Maksettu toimituksen yhteydessä

Related to Model, SimTalk 2.0

Simulation Aided Scheduling Tool for Reconfigurable

Assembly Systems

The process:

1. Build the simulation in 2D.

2. Build the flow process for each product.

3. Insert average processing time (refer table) for each step.

4. Insert the number of products that arrive for each product (refer table, already

highlighted).

5. Insert the working hour shift

a. Shift 1: 0830 – 1230

b. Shift 2: 1330 – 1730

c. Monday -Friday only

6. The simulation needs to identify the number of days that every product will complete

based on the average processing time, working hour shift, the number of products that

arrive.

To build the model you can use anything you what related to Tecnomatix Plant

Simulation 15 such as MU, Method and etc

For the result, I need:

• Number of days for each product to finish

• Display in Gantt Chart.

Valmistuksen suunnittelu Assembly Computer Aided Manufacturing Arena Simulation Programming Manufacturing Engineering

Projektin tunnus: #30655672

Tietoa projektista

1 ehdotus Etäprojekti Aktiivinen 2 vuotta sitten

1 freelanceria on tarjonnut keskimäärin %project_bid_stats_avg_sub_23% %project_currencyDetails_sign_sub_24% tähän työhön

amarvnit22

AN OVERVIEW ~ Offering over 6+ years of experience~ Work as Discrete Event Simulation Engineer for FMCG Work as Method Engineer in Aerospace Manufacturing Plant Proficient communication and inter-personal skills. Atti Lisää

$200 USD 7 päivässä
(0 arvostelua)
0.0