Suodata

Viimeisimmät hakuni
Suodatusperuste:
Budjetti
asti
asti
asti
Tyyppi
Taidot
Kielet
    Työn tila
    17 kwh meter työtä löytyi, hinnoittelu EUR

    ...horas al dia - Que me ayude hacer la matriz de cada capítulo. -que me ayude a crear una vida y un pasado a algunos personajes, así como de ideas y sugerencias de donde y como meter muchos personajes en mi historia. -que sepa de estructura temporal. -que sepa crear coherencia en la trama, organizar los flashbacks si los hay. -y mente abierta. -de preferencia

    €23 (Avg Bid)
    €23 Keskimäär. tarjous
    1 tarjoukset
    Trophy icon Professional interior design for my room 3 päivää left

    ...manufacture ) You will see in the picture his" place is empty ) TV, mosaic tile and wall color and of course the door and window. Chamber Size: Height: 3 meter length: 3 meter 50 cm Width: 3 meter 10 cm My requirements A beautiful decoration of the room : and curtain of course ,table ,carpet,bulb decor and all thing you will see it will be good

    €398 (Avg Bid)
    Mainostettu Taattu Sinetöity Huippukilpailu
    €398
    6 työtä

    Hello, I need Wi-Fi based smart energy meter (single and 3 phase) using wemos D1 mini (preferably) and it must be controlled using android application (customized). The application must display the power consumed in units, energy, voltage, current and other respective parameters. The most important thing is that the hardware must be highly reliable

    €138 (Avg Bid)
    €138 Keskimäär. tarjous
    6 tarjoukset

    ...possible. App 1: Meter reading & Household invoicing (using FulcrumApp) The first app is to calculate and provide the water bill to a household whilst at site. In the app previous meter readings and amounts owing will be uploaded (by head office). The site staff will then visit a house and input the water meter ID number and the water meter reading, and

    €538 (Avg Bid)
    €538 Keskimäär. tarjous
    18 tarjoukset

    House is of 150 sq. meter. I am planning to have a complete renovation of house along with building a another floor on too. Right it’s only on ground floor

    €11 / hr (Avg Bid)
    €11 / hr Keskimäär. tarjous
    22 tarjoukset
    Build prototype sma TR3B Astra 4 päivää left
    VARMENNETTU

    Hello i need a robotics and ingenier system for a plane mode one meter times meter of the tr3b Astra The plane is supost be operated remotly and on distences of wifi and operated bye sim wifi card and remote control For more [kirjaudu nähdäksesi URL:n]

    €736 (Avg Bid)
    €736 Keskimäär. tarjous
    9 tarjoukset
    Trophy icon Kiosk render 2 päivää left

    Looking to design me a 3 by 2 meter kiosk Including video walls and totems for advertising purposes for use in shopping centres supermarkets images provided of similar kiosks and branding Brand is nzo vaping device

    €46 (Avg Bid)
    Taattu
    €46
    4 työtä
    Design a Commercial Building 4 päivää left
    VARMENNETTU

    ...elevator) • Include an Office terrace on the 3rd floor • Concept design for the ground floor can be changed (please don't remove swim school features) • Include a 2x5 meter underground space for a pool pump room • Follow Oman Laws and Regulations • Be based from Krooki site plan • Floor plan for Basement parking. Separate entry and exit on le...

    €2186 (Avg Bid)
    €2186 Keskimäär. tarjous
    24 tarjoukset
    Aurdino smart water meter database 3 päivää left
    VARMENNETTU

    I need to create a smart water filter which customer use as prepaid water filter.

    €118 (Avg Bid)
    €118 Keskimäär. tarjous
    8 tarjoukset

    Hi All I’m looking for a portal to display the data from elgas devices pressure meter reads corrected and uncorrected this is one the manufacturers have drivers for the elgas devices [kirjaudu nähdäksesi URL:n] [kirjaudu nähdäksesi URL:n] There’s

    €1231 (Avg Bid)
    €1231 Keskimäär. tarjous
    16 tarjoukset

    ...attached) this is not a page, rather shows the categories for filtering and for the data which need to be provided by our clients to characterize storage space a) Space Square meter vs. Number of pallets, Ceiling Height, max. Weight (all fields are textual entry fields) b) Temperature Not controlled, Ambient, Chilled, Frozen (all fields are check boxes)

    €183 (Avg Bid)
    Huippukilpailu
    €183
    4 työtä

    ...sección estan en las imágenes. Las secciones incluyen “MEJORAS FUTURAS” que no van a ser implementadas pero deben ser tomadas en cuenta en el desarrollo para que se puedan meter en un futuro. 1.- SECCIÓN CHAT Chat simple. Sólo 1 canal. Se requiere Usarname pero no se requiere la creación de la cuenta. Filtrar por "lenguaje incorrecto&...

    €1152 (Avg Bid)
    €1152 Keskimäär. tarjous
    33 tarjoukset
    Resistance Meter 10 tuntia left
    VARMENNETTU

    Looking for a microcontrol based "OHM METER" (Auto range) which can precisely measure resistance from 0.01ohm to 120Mega Ohms. Resistance Value to be displayed on a 16*2 LCD dotmatrix display. Maximum possible digits after decimel are to be shown while measuring Mega ohm values. A relay is to be switched ON/OFF by a switch. On OFF mode, The relay should

    €57 (Avg Bid)
    €57 Keskimäär. tarjous
    8 tarjoukset
    I need a Arduino /IOT developer 7 tuntia left
    VARMENNETTU

    ...energy efficiency and sustainability in all sectors thereby resulting in 30-40% reduction in cost, often with no or minimal cost. We work with customers on both sides of the meter to reduce operating expenses, upgrade and maintain facilities, stabilize energy costs, improve occupancy comfort levels, increase energy reliability and enhance the environment

    €116 (Avg Bid)
    Mainostettu
    €116 Keskimäär. tarjous
    11 tarjoukset

    the meter has burned as the previous electrician has connected the solar neutral on the main neutral. the meter should be replaced and the two neutral should be distinct.

    €22 (Avg Bid)
    €22 Keskimäär. tarjous
    1 tarjoukset

    ...are indicated on the LOT plan. The City has given us the following limits as to easements on the property: a) Fronting the Street: structures should have a minimum of 3 meter distance from property line b) Beside Neighbors: Structures should have a minimum of 2 meters distance from property line c) Building Foot print should not exceed 50% of property

    €46 (Avg Bid)
    Taattu
    €46
    4 työtä