EXPLORE


0.0
0.0
0%
$10 USD / Hour
・

India (6:11 AM)
・
Joined on August 23, 2009
$10 USD / Hour
・
Creating new concept design and development of Complete Gear box design Boost ideas and cost reduction ideas Casting design sheet metal design Plastic design 2D into 3D creation Conversion from Solid Model (IGES, STEP) to Parameter as per requirement. Drawing creation with GDand T Main project involved in automobiles Exhaust and Cooling and CAC development system.( BHARAT BENZ ) Engine mounting, Fuel tank mounting & Urea tank mounting system.( BHARAT BENZ ) CRS development system for 6D Engine. ( BHARAT BENZ ) Braking system. (BHARAT BENZ & VOLVO ) Electrical harness routing development system. ( BHARAT BENZ ) Garden equipment tools. ( ROBERT BOSCH ) Interior and Exterior (Trim parts) design development. ( VOLVO ) Rear axle assembly.( BHARAT BENZ ) Software Capabilities: UGNX 12.0, Solid works, Catiav5,Creo,Pro/Wild fire2.0, AutoCAD, Teamcenter,Smargd,Kola,PDM & PLM
No reviews to see here!
Experience
Design support
Sep, 2019 - Present
•
6 years, 9 months
Tranquil Transmission
Sep, 2019 - Present
•
6 years, 9 months
Creating new concept design and development of Complete Gear box design Boost ideas and cost reduction ideas Casting design sheet metal design Plastic design 2D into 3D creation Iges and step conversion Drawing creation with GDand T
Sep, 2019 - Present
•
6 years, 9 months
Sr design engineer
May, 2018 - Jul, 2019
•
1 year, 2 months
Bharat benz through GGSI
May, 2018 - Jul, 2019
•
1 year, 2 months
product development and concept design •Conversion from Solid Model (IGES, STEP) to Parameter as per requirement. Creating drawing with GD&T ISO standard Cost Reduction (Boost) Ideas and Furnish Release Decision.
May, 2018 - Jul, 2019
•
1 year, 2 months
Sr Design Engineer
Sep, 2013 - Nov, 2017
•
4 years, 2 months
Bharat benz through Cades
Sep, 2013 - Nov, 2017
•
4 years, 2 months
•Design and development (New & Existing) and analysing parts. stack-up analysis and assembling in Proto fitment. Solid Model (IGES, STEP) to Parameter as per requirement. •Guide and Support the Team for Failure Investigation / Resolution. •Assist the Team in Evaluation of Cost Reduction (Boost) Ideas and Furnish Release Decision and BOM preparations for Development System.
Sep, 2013 - Nov, 2017
•
4 years, 2 months
Education
Anna University
2001 - 2005
•
4 years
Mechanical Engineering

India
2001 - 2005
•
4 years
Qualifications
HSC
2000
State board university
physics maths chemistry biology
2000
Verifications