● Rack mount all the physical devices.

o 2 x UCS 5108 Blade Server AC2 chassis new

o 2 x UCS 6248UP 1RU Fabric Interconnect

o 2 x N9K-C93180YC-EX

● Cable connectivity between above all devices. Will do vPC configuration where needed.

o IOM ←→ FI (backplain)

o FI ←→ Upstream N9K (for data, vPC)

o FI ←→ NetApp storage (for storage)

o FI ←→ Mgmt switch (for FI’s management)

o FI L1-L2

o N9K mgmt connectivity

o N9K ←→ Core switch connectivity

o Backup device EMC Avamar connectivity (no configuration changes of any nature, storage team need to take care of any change if needed)

o Power connection to all devices etc.

● Update the firmware of all the new devices.

o UCSM upgrade

o Fabric Interconnect upgrade

o IOM upgrade

o Servers (CIMC, Adapters etc.) upgrade

● Configure UCS manager and configure the data connectivity between new FI and existing FI.

o Data Connectivity between N9K and FI for north/south traffic

● Storage connectivity to FI (Parallel connectivity with Nexus 5010 also till the migration complete).

● Installation of ESXi 6.0 on new 7 x UCS B200 M5 server and configure the management IP.

● Installation of VCSA 6.0 for new ESXi cluster or connect to existing vCenter and create ESXi cluster.

● Nexus 5010 configuration will be replicated on new N9K switches.

Verkkosivujen suunnittelu

Projektin tunnus: #17386597

Tietoa projektista

2 ehdotusta Etäprojekti Aktiivinen 5 vuotta sitten

2 freelanceria on tarjonnut keskimäärin $22/tunti tähän työhön

maxlogic7

Hi, Thank you for giving me a chance to bid on your project. i am a serious bidder here and i have already worked on a similar project before and can deliver as u have mentioned I have got Rich experience in Jooml Lisää

$22 USD / tunti
(0 arvostelua)
0.0