
Closed
Posted
Paid on delivery
EV Charging Station + Cafe — Architectural Design Brief Site Overview • Quadrilateral plot bounded by Pt5–Pt4–Pt3–Pt6, fronting two separate 9m-wide roads (one along Pt14 side, one along Pt9-Pt10-Pt11 side) — a through/double-frontage plot • Approximate side lengths: Pt5–Pt4: 12.0m | Pt4–Pt3: 13.7m | Pt3–Pt6: 12.5m | Pt6–Pt5: 9.7m • Additional internal/diagonal reference distances noted on survey: 16.1m and 17.5m — freelancer to confirm exact plot geometry against the stakeout survey/coordinates before finalizing layout • Double road frontage is a design advantage: separate entry/exit for vehicles, or one road for charging bay access and the other for cafe customer parking/walk-in Project Brief Design a two-purpose facility: EV charging station (ground floor) + cafe (can be ground or first floor, freelancer to advise based on plot shape and visibility). Functional Program EV Charging Zone • Charging bays for DC fast chargers (2x180kW or 2x80kW depending on final station spec — confirm with client) • Clear vehicle circulation: entry, charging bay approach, exit — using the double road frontage for one-way flow if possible • Driver waiting/lounge area (can overlap with cafe seating) • Electrical room/transformer + DU (distribution unit) area — needs to be close to charger positions, adequately ventilated • Restroom (customer-facing) Cafe • Seating area (indoor + optional outdoor/covered seating facing road) • Kitchen/prep area • Counter/billing area • Could be positioned on first floor (G+1) for road visibility and to free up ground floor for charging bay maneuvering — freelancer to propose best massing Sustainability • Rooftop solar provision (target ~20kW, confirm with client) — structural allowance needed on roof/first floor slab • Rainwater harvesting provision (recommended for KA compliance) Site Constraints & Considerations • Confirm setback requirements per local municipal/BESCOM norms for corner/through plots • Vehicle turning radius for cars/small trucks accessing DC fast chargers — plan bay width and approach accordingly • HT electrical connection and transformer placement — coordinate with electrical contractor (500kVA sanctioned load if applicable) • Signage/visibility from both road frontages Deliverables Requested from Freelancer • Concept site plan showing charging bay layout, cafe zone, circulation, parking • Floor plans (ground floor + first floor if G+1) • Elevations (at least front views from both road frontages) • 3D render/visualization (optional but preferred for client presentation) • Structural provision notes for rooftop solar • Estimated built-up area and cost-per-sqft ballpark Notes for Freelancer • Client to confirm final charger count/capacity before layout is locked • Plot dimensions to be verified on-site against the stakeout survey before design finalization • Design should allow phased construction if needed (Phase 1: charging infra + basic structure; Phase 2: cafe fit-out)
Project ID: 40722096
10 proposals
Remote project
Active 1 day ago
Set your budget and timeframe
Get paid for your work
Outline your proposal
It's free to sign up and bid on jobs
10 freelancers are bidding on average ₹7,328 INR for this job

As an architect and engineer with a wealth of experience in designing commercial spaces, I believe I am the ideal professional to create your Green Energy Hub. I bring to the table extensive skills in 3D visualization, AutoCAD, building architecture, civil engineering, and interior design - all of which are critical for your project's success. My understanding of zoning and municipal compliance coupled with my fluency in numerous software packages will ensure all your needs are met and executed to perfection. One aspect that will benefit you greatly is my proficiency in environmentally sustainable designs. Given your 'green' brief, my ability to incorporate solar provisions and rainwater harvesting will not only meet compliance requirements but also help reduce the establishment's carbon footprint, which is essential in today's climate-conscious world. With a focus on the future of electrification, crafting convenient vehicle circulation routes, efficient parking layouts while maintaining maximum road visibility for both cafe patrons and electric vehicle owners will be my priority.
₹12,500 INR in 3 days
7.6
7.6

Hello sir I am a Senior Electrical Power Systems Engineer leading a multidisciplinary team encompassing architectural, structural, mechanical, and electrical engineering disciplines. We specialize in EV charging infrastructure design, solar PV integration, grid interconnects, and commercial facility layouts. Site Circulation & Vehicle Dynamics: Utilizing the through-plot double road frontage (Pt14 road and Pt9-Pt10-Pt11 road) to create a seamless, one-way vehicle entry and exit flow. This eliminates turning tight radii or backing up near high-voltage equipment, accommodating all vehicle wheelbase types for 180kW/80kW DC fast chargers. Building Massing Strategy (Recommended G+1 Structure): Ground Floor: Dedicated to EV charging bays, a ventilated HT Transformer/Switchgear room, Distribution Units (DU), an accessible customer restroom, and a ground-level coffee grab-and-go counter. First Floor (G+1): Elevator-accessible/stair-connected main cafe seating, commercial kitchen/prep area, counter, and covered outdoor terrace/balcony overlooking both road frontages for maximum commercial visibility and comfort. High-Voltage (HT) Power Infrastructure & Safety: Sizing and placing a dedicated 500kVA transformer yard/indoor electrical room with fire-rated segregation, natural/forced ventilation, and oil retention pits in compliance with utility standards. eslam
₹7,000 INR in 7 days
5.4
5.4

Hi Sir i read your message, as per your requirement complete your project. if you feel free can lets talk about the project. check my Portfolio https://www.freelancer.com/u/rumpadas099 Thank you Sanjoy
₹5,700 INR in 7 days
4.9
4.9

With over a year of experience in the creative design industry, and having completed various projects including 3D renderings, structural drawings, and interior designs, I'm confident that my skillset perfectly aligns with your needs for this architectural project. Being versatile in software such as AutoCAD, Sketchup, Revit Luminous, and the Adobe Creative Suite, I can proficiently visualize intricate designs and communicate them effectively to clients.
₹6,000 INR in 1 day
4.9
4.9

The double road frontage here is a real design opportunity, using it to separate charging bay circulation from cafe customer access means the two functions don't conflict on site, which is often the hardest part of getting an EV + cafe combo layout to work smoothly. Before finalizing anything, I'd verify the plot geometry against your stakeout survey since the internal diagonal references suggest the quadrilateral isn't a simple rectangle, getting that confirmed early avoids rework later. My proposed massing would put the charging bays and electrical/DU room on the ground floor near the charger positions with proper ventilation clearance, and evaluate whether the cafe works better at ground level or first floor based on how it affects visibility from both frontages and how much ground floor space the charging bay maneuvering actually needs, I'll advise on this once plot geometry is confirmed. Deliverables would include the concept site plan with circulation and parking, ground floor and first floor plans, elevations from both road frontages, a 3D render for client presentation, structural provision notes for the rooftop solar load allowance (for your structural engineer to formalize), and a ballpark built-up area and cost-per-sqft estimate. I'm building my track record on this platform right now, so this project will get full attention to make sure the circulation logic and phased construction flexibility genuinely work in practice, not just on paper.
₹7,000 INR in 5 days
0.0
0.0

A double-frontage EV charger plus café plot only works if vehicle circulation and pedestrian café entry are separated early against the survey. Approximate side lengths help, but final bay counts and café footprint should wait until the stakeout coordinates confirm the quadrilateral and the two 9 m road edges. I would verify plot geometry from your survey, propose a layout that splits EV entry/exit from café frontage, and deliver architectural CAD plus clear 3D visualisation suitable for review—covering charging bays, café shell, and circulation without guessing setbacks. Similar mixed-use site layouts I produce start from survey confirmation so later detailing does not fight the boundary. Can you share the stakeout survey/coordinates and any local setback or parking-bay standards I must respect? Ridwaan M
₹7,080 INR in 7 days
0.0
0.0

India
Member since Nov 2, 2015
₹1500-12500 INR
₹1500-12500 INR
₹1500-12500 INR
$250 AUD
₹1500-12500 INR
₹750-1250 INR / hour
£20-250 GBP
$250-750 USD
₹600-1500 INR
$15-25 USD / hour
$250-750 AUD
£20-250 GBP
$5000-10000 USD
₹12500-37500 INR
$30-250 USD
₹37500-75000 INR
₹1500-12500 INR
$10-30 CAD
₹1500-12500 INR
$15-25 USD / hour
$30-250 USD
₹1500-12500 INR
$30-250 USD