Suljettu

Change order; from Steel to Wood support

Hi, Already have approved and stamped plans. The framer wants to switch gears on the support. So, this would just be a change order. We are Buiding a 2 story ADU (granny flat) and decided to change the support from steel to [login to view URL] the previous engineer had steel included in the framing is still baffling for such a small house. I need a structural engineer, to make the changes from steel to wood and to stamp his seal of approval on all the changes. My previous engineer seems too incompetent and apathetic. if someone can help with not much money. I certainly would appreciate it. Attaching original plan with steel parts. Thanks! Kevin

Taidot: Rakennetekniikka

Näytä lisää: steel beam to wood wall connection, wood joist to steel beam connection detail, attaching wood to metal studs, attaching steel to wood, wood to steel connection details, packing steel beam with wood, connecting wood to steel i beams, steel beam to wood post connection detail, sample web contract change order, drag drop change order mysql, free change order forms, pdf change order layout, php mysql change order, change order owner contract, change order within grid extjs, change order number oscommerce, change order php, change order dynamic list, zen cart super orders cant change order, scriptaculous list change order

Tietoa työnantajasta:
( 0 arvostelua ) San Diego, United States

Projektin tunnus: #27881783

4 freelanceria on tarjonnut keskimäärin $561 tähän työhön

(30 arvostelua)
6.3
struct2019

I'm Professional Civil/Structural Engineer with 20yrs of experience as Structural Engineer,Consultant and Estimation ,I can delivered the project on time,econimical result within the budget. I can start the project rig Lisää

$500 USD 7 päivässä
(12 arvostelua)
5.2
(16 arvostelua)
4.3
Jada327

I can easily calculate and detail this for you. I do these types of design members routinely in my full time job.

$444 USD 5 päivässä
(0 arvostelua)
0.0