
Completed
Posted
Paid on delivery
University Assessment for Building Measurement see brief below - Steps to Complete Assessment Scenario: You are working as a Quantity Surveyor at ‘QS Services Pty Ltd’. You are assigned to a new project. The Client wants to prepare Concrete, Formwork and Reinforcement Bills of Quantities (BOQ) for the project. Due to increasing focus on Embodied Carbon in the industry the Client Mr Almeida from Complex Developers is interested in calculating the embodied carbon for concrete use in the project as well. Task 1: You are required to choose either option 1 or option 2 from the Table 1 below and prepare Bills of Quantities for the given project according to the Australian and New Zealand Standard Method of Measurement (2022) edition. (For example, if you choose Option 1, you will submit BoQ for Concrete and Formwork sections.) Table 1: Options Option Inclusions Option 1 Option 2 Bills of Quantities for the following trades should be completed and submitted • Concrete • Formwork Bills of Quantities for the following trades should be completed and submitted • Concrete • Reinforcement Task 1 should include the following: 1. List of assumptions – Students are encouraged to make sensible assumptions where drawings and specifications are not clear and where there are discrepancies between drawings and specifications. (One Page Only) 2. CostX file in ‘.exf’ format imported and uploaded. All the calculations should be clearly provided including the following. a. Relevant drawings are uploaded, named and filed in a consistent format, showing the digital measurement b. Dimension groups are created and named where necessary. c. All the relevant items are identified and measured providing correct unit of measurement 3. Prepare the following bills and extract into PDF format using CostX Option 1 a. Concrete b. Formwork Option 2 a. Concrete b. Reinforcement All the relevant drawings, reports and details are provided in a separate folder named “Group Assessment Drawings” nested under “Group Assessment Set up and Communication” section in the Moodle. 2 Task 2: Calculate the Embodied Carbon for concrete using the quantities calculated for Concrete BoQ, Use the Environmental Performance in Construction (EPiC) database to get data on coefficients. construction Write a business letter to the Client explaining the method used, providing details of the database you used for calculations and the embodied carbon from Concrete. Attach detailed calculations as an annexure to the letter.
Project ID: 40790166
24 proposals
Remote project
Active 6 days ago
Set your budget and timeframe
Get paid for your work
Outline your proposal
It's free to sign up and bid on jobs
24 freelancers are bidding on average $436 AUD for this job

Hello, Our structural and civil engineering expertise is directly suited to preparing measured Concrete, Formwork and Reinforcement BOQs for a building assessment. I can work from the supplied drawings, apply the Australian and New Zealand Standard Method of Measurement 2022 requirements, and produce clear, properly organised quantity documentation. My skills in AutoCAD, Building Architecture, Civil Engineering, Structural Engineering and Environmental Engineering support both parts of this assessment: accurate identification of building elements and a sound embodied-carbon assessment for concrete. I can prepare the relevant CostX measurement outputs and PDF bills, document sensible assumptions, and present the EPiC-based concrete carbon calculations with a professional client letter and annexure. I am also experienced in project-focused technical delivery and clear engineering documentation. Choose me to produce a well-structured assessment package that connects the measurements, BOQs and carbon analysis accurately. Thanks!
$750 AUD in 1 day
6.6
6.6

My 12 years delivering residential and commercial architectural projects make me well suited to prepare accurate building measurement documentation from construction drawings. My experience with AutoCAD and building architecture supports clear interpretation of plans, sections, elevations and structural details needed for concrete, formwork or reinforcement quantities. I can organise the relevant drawings consistently, identify measurable items, and present the results clearly in professional BOQ documentation. My architectural background also supports careful assumptions where drawings or specifications contain gaps, while maintaining a structured, detail-focused approach. I can prepare the concrete quantity information required for the embodied-carbon assessment and present the calculations and client-facing business letter in a clear professional format. I am ready to apply my construction-documentation experience to this assessment and deliver well-organised, accurate work aligned with the brief.
$300 AUD in 2 days
6.5
6.5

Hello, I have experience in quantity surveying, CostX digital takeoffs, and preparing Bills of Quantities for concrete, formwork, and reinforcement. I'm familiar with ANZSMM 2022 measurement requirements and embodied carbon calculations using the EPiC database. I'll review the drawings and specifications, document assumptions, and organize accurate measurements with clearly labeled CostX dimension groups. I'll prepare the selected BOQs, verify quantities and measurement units, and provide the CostX .exf file with PDF reports. I'll calculate concrete embodied carbon using EPiC coefficients and prepare a professional client letter explaining the methodology, results, and detailed calculation annexure. Thanks for reading my proposal. Edwin
$500 AUD in 4 days
5.4
5.4

My background in engineering calculations, Civil Engineering, Structural Engineering and Construction Management aligns directly with preparing your concrete BOQ and embodied-carbon assessment. Since 2014, I have completed 150+ projects for clients across Australia, the UK, US, Europe and the Gulf, including construction scheduling, detailed spreadsheet models and technical documents. I can apply that measurement and analytical experience to the selected CostX option, keeping drawings, dimension groups, quantities, units and BOQ outputs clearly organised. My chemical engineering background is also valuable for the carbon component: I am experienced in data analysis and engineering calculations, and can present the EPiC-based concrete assessment with transparent calculations and a professional business letter with annexure. I would be pleased to prepare an accurate, well-documented submission covering the required CostX files, extracted PDF bills and embodied-carbon documentation.
$500 AUD in 7 days
5.4
5.4

Hello, My 8+ years of architectural experience and expertise in construction-ready drawings make me well suited to support your CostX BOQ and carbon assessment. I regularly interpret residential, commercial and industrial project documentation, with strong attention to accurate dimensions, quantities and technical detail. My AutoCAD and building architecture skills are directly relevant to reviewing the supplied drawings, identifying concrete and associated building elements, and presenting clear measurement information. As a qualified architect experienced in Revit and BIM modelling, I can also work confidently with coordinated project documentation and help produce organised, professional assessment deliverables, including the BOQ outputs, drawing-based measurements and embodied-carbon calculation documentation. I am detail-oriented and deadline-focused, and I would be pleased to apply my construction documentation experience to your chosen BOQ option and concrete carbon assessment. Choose me to complete this assessment with accuracy and professional presentation. Thanks!
$250 AUD in 2 days
4.9
4.9

I have 14 years of experience in technical analysis, data processing, measurement calculations, and structured reporting. I can help prepare your Building Measurement assessment using the supplied architectural and structural drawings, including accurate concrete BOQs, CostX measurement calculations, and a clear one-page assumptions sheet. I can also help with formwork or reinforcement quantities, depending on your selected option, and calculate the embodied carbon of concrete using appropriate EPiC database coefficients. The final deliverables will be organised professionally, with BOQ PDFs, supporting calculations, and a business letter to the client. I work efficiently and aim for a quick turnaround while carefully checking measurements, units, and calculations against the supplied drawings and assessment requirements. My pricing is flexible and open to discussion based on the scope.
$250 AUD in 1 day
3.8
3.8

Hi , I’ve carefully reviewed your project "CostX BOQ and Carbon Assessment", and I’m confident that my experience with Building Architecture, Project Management, Structural Engineering, Civil Engineering, Construction Management, Environmental Engineering, Quantity Surveying and AutoCAD makes me a strong fit for this project. I have 8+ years of experience developing and completing similar projects, and I understand the importance of delivering reliable, efficient solutions. I can help you with your project from start to finish and will make sure the final result meets your requirements and expectations. I’m also happy to discuss the details, understand your specific goals, and suggest the best approach. If you’re interested, click the Chat button and send me a message. I’d be happy to discuss your project and get started. I look forward to hearing from you. Best regards, Viggo
$250 AUD in 4 days
3.9
3.9

I can help you complete this University Assessment for Building Measurement step by step, including the Bills of Quantities (BOQ), CostX measurement setup, embodied carbon calculations using the EPiC database, and the formal business letter to the client. The most important thing to understand is that the project drawings and specifications are needed before the actual BOQ quantities and embodied carbon totals can be calculated accurately.
$1,200 AUD in 7 days
3.2
3.2

I’d be happy to assist you with your Building Measurement assessment, particularly the preparation of Bills of Quantities using CostX and the embodied carbon calculations for concrete. I understand the requirements of both tasks and the importance of following the Australian and New Zealand Standard Method of Measurement (2022). My approach would begin by reviewing the project drawings, specifications, and marking rubric to determine whether Option 1 (Concrete and Formwork) or Option 2 (Concrete and Reinforcement) is more suitable. I would guide you through accurate quantity take-offs in CostX, including drawing organisation, dimension groups, measurement units, detailed calculations, and preparation of the required BOQ reports in PDF format. I would also help you check the CostX .exf file and prepare a clear, one-page assumptions register addressing missing details or drawing discrepancies. For Task 2, I would support the embodied carbon assessment using concrete quantities and verified coefficients from the EPiC database, ensuring correct units, transparent calculations, and clearly documented assumptions. Finally, I would help structure and review the professional business letter to Mr Almeida, including the calculation methodology, results, and supporting annexure.
$250 AUD in 3 days
2.9
2.9

Hi there, The main challenge here is keeping the CostX measurements, ANZSMM 2022 measurement rules, BOQ units, and EPiC carbon calculation consistent—especially when the drawings leave gaps or conflict with the specifications. I can guide you through the assessment so you develop your own submission: setting up the CostX dimension groups, checking your measurements and assumptions, and working through the concrete-carbon calculation and client-letter structure. I have two quick questions to make sure we’re on the same page: Have you chosen Option 1 (concrete and formwork) or Option 2 (concrete and reinforcement)? Do you have the project drawings and specifications, and have you started measuring in CostX yet? Let’s discuss your project now!
$300 AUD in 3 days
2.6
2.6

I can assist with your Building Measurement assessment by preparing a structured quantity take-off and Bills of Quantities in accordance with the Australian and New Zealand Standard Method of Measurement (ANZSMM 2022). My Approach I will review the project drawings and specifications, document reasonable measurement assumptions, and organize the take-off in CostX with clearly named drawings and dimension groups. I can complete either Option 1 (Concrete and Formwork) or Option 2 (Concrete and Reinforcement), ensuring the quantities and units are clearly presented. I will also calculate concrete embodied carbon using relevant coefficients from the EPiC database and explain the methodology and results in a professional business letter. Deliverables One-page list of assumptions CostX measurement take-off and calculation records Concrete and selected trade BOQs exported to PDF CostX .exf file, subject to the supplied project files and software compatibility Embodied carbon calculations with a detailed annexure Business letter addressed to Mr Almeida Questions Which option have you selected: Option 1 or Option 2? Could you share the project drawings, specifications, and assessment resources from Moodle? Once I review the files, I can confirm the scope, workflow, and estimated timeline. Best Regards, Sidra https://www.freelancer.pk/u/sidratulm20
$250 AUD in 3 days
2.4
2.4

I can prepare a clear, assessment-ready CostX BOQ for the concrete section and the chosen trade, with assumptions stated sensibly where the drawings or specifications are unclear. I can also write the business letter explaining the embodied carbon calculation for concrete in a professional way that suits a university QS submission and client-facing format. The final deliverables will be accurate BOQ outputs, a concise annexure of calculations, and a well-structured letter that shows the method, EPiC database use, and carbon result clearly. I will keep the work aligned to the Australian and New Zealand Standard Method of Measurement 2022, using logical measurement, clean formatting, and careful editing so the submission reads as credible, consistent, and ready for assessment. Javvad PhD Scholar | Lecturer | Research • Writing • Analysis
$250 AUD in 1 day
0.0
0.0

My background in architectural, structural and BIM documentation is directly suited to producing clear construction quantities from project drawings. I work with AutoCAD and Revit to develop structural and RCC general arrangement drawings, coordinated models, schedules and quantity take-offs—skills that align closely with the required Concrete, Formwork or Reinforcement BOQ assessment. My focus is on accurate, well-organised quantity documentation and professional presentation. Choose me to complete this assessment with a technically clear and carefully prepared submission.
$250 AUD in 2 days
0.0
0.0

Hello, My AutoCAD and Building Architecture skills are directly relevant to preparing accurate construction measurements from project drawings. I can support the assessment with clear interpretation of architectural information and organised quantity take-off for the selected Concrete/Formwork or Concrete/Reinforcement option. I can also prepare the associated presentation materials, including a structured assumptions sheet, clearly documented quantity calculations, BOQ outputs, and the concrete embodied-carbon assessment using the quantities provided and EPiC coefficients. My 16+ years of professional experience, supported by a 55+ member technical team, enables careful handling of drawing-based documentation and polished final deliverables. I would be pleased to complete this university assessment with accurate, well-organised BOQ and carbon-assessment documentation aligned with the brief. Thanks!
$555 AUD in 1 day
0.0
0.0

⭐⭐⭐⭐⭐ I can assist with your quantity-surveying assessment by preparing an ANZSMM (2022)-compliant BOQ for either Concrete and Formwork (Option 1) or Concrete and Reinforcement (Option 2), including clearly documented measurement calculations, assumptions, dimension groups, and CostX-ready measurement records. I can also calculate concrete embodied carbon using relevant EPiC database coefficients and prepare a professional business letter to Mr Almeida with the methodology, results, and a detailed calculation annexure, once you provide the project drawings, specifications, and assessment files. Best regards
$400 AUD in 3 days
0.0
0.0

I understand the project requirements for the CostX BOQ and Carbon Assessment for the University Assessment of Building Measurement. I will use my 20+ years of experience in quantity surveying and construction to prepare the Building Measurement Order (BOQ) and perform a carbon assessment. I will deliver the BOQ in CostX format, along with detailed plan and profile sheets in PDF, and earthwork quantities in Excel. Additionally, I will provide a comprehensive carbon assessment report. Do you require any specific data or templates for the CostX input? Regards, Engr. Zahid Karim, Quantity Surveyor.
$420 AUD in 5 days
0.0
0.0

Sydney, Australia
Payment method verified
Member since Oct 27, 2026
$30-250 AUD
min $50 USD / hour
₹12500-37500 INR
₹600-1500 INR
$30-250 AUD
£250-750 GBP
$1000 AUD
$15-25 USD / hour
£250-750 GBP
$10-50 USD
₹12500-37500 INR
$750-1500 USD
$250-750 AUD
₹600-1500 INR
$25-50 CAD / hour
$30-250 USD
$10-30 USD
$250-750 USD
$30-250 USD
$15-25 USD / hour
$250-750 USD