
Closed
Posted
Paid on delivery
Freelance Civil Engineer Needed – City of Gunnison, CO (Permit Resubmittal) Must be able to talk on phone and be in the USA I have a complete MEP plan set that was recently returned by the City of Gunnison, Colorado with plan-review comments. Only need responses to comments 5,8,9,13,15,16 and 17 The majority of comments relate to civil / plumbing coordination, specifically sanitary sewer, domestic water, and natural gas piping layout and schematics. I am seeking a licensed Colorado Professional Engineer (PE) with direct experience in Colorado municipal review to: only need comments 5, 8,9,13,15,16 and 17 Methodically address each civil-related plan-check comment Revise the existing plumbing/civil drawings (no redesign from scratch) Update calculations and details only where required Prepare a permit-ready resubmittal package that satisfies City of Gunnison code without introducing scope creep You will be working directly from my existing PDF and native CAD files, along with the official plan-check report. Accuracy and discipline are critical — this is a targeted correction effort, not a conceptual redesign. Scope of Work / Deliverables Revised Sanitary Sewer, Water, and Gas utility sheets Updated piping layouts, riser diagrams, and schedules as required Supporting engineering calculations where revisions trigger updates A clear, concise comment-response letter cross-referencing each City comment to the exact sheet and revision Final Colorado-stamped PDF set plus native CAD files, ready for direct upload to the City of Gunnison permitting portal Requirements Active Colorado PE license (required to stamp) Demonstrated experience with Colorado municipal plan review (Gunnison or similar jurisdictions preferred) Strong command of utility separations, slopes, cleanouts, and code coordination Ability to work efficiently from redlines and existing documents Clear communication and fast turnaround Next Steps only need comments 5,8,9,13,15,16 and 17 I can provide: Red-lined plans The City’s full markup and comment letter immediately Please reply with: Your availability Estimated turnaround time - ASAP 1 week max - sooner the better Confirmation of Colorado stamping capability Relevant project experience (brief) - This project is approval-driven and time-sensitive. I’m looking for someone who can execute cleanly and close this out.
Project ID: 40142550
20 proposals
Remote project
Active 4 mos ago
Set your budget and timeframe
Get paid for your work
Outline your proposal
It's free to sign up and bid on jobs
20 freelancers are bidding on average $1,195 USD for this job

Hello, With over a decade of engineering experience, specifically in civil engineering, I believe I am the perfect fit for your project. Not only am I an active Colorado PE license holder, but my previous works have honed my skills in municipal plan reviews, making me ideally familiar with Colorado's codes, including those governing Gunnison. More importantly, my particular knowledge of utility separations, slopes, cleanouts, and code coordination ensures that I'm well-equipped to handle the MEP coordination issues that you need assistance with. I have also meticulously worked on plumbing/civil drawings before, making revisions and updating where needed - without introducing any scope creep. Accuracy and discipline are my guiding principles to execute efficiently while avoiding unnecessary redesigns. I humbly submit that choosing me for this project guarantees a detailed and high-quality deliverable. My turnaround time aligns with your timeline as I prioritize your needs; I can complete this task within a week or sooner. I assure you that using my services will result in a permit-ready resubmittal package that not only thoroughly addresses each comment but also meets the City of Gunnison code. My final Colorado-stamped PDF set and native CAD files will be prepared to make your upload process seamless on the permit portal. Let me help you close this project diligently and effectively. Thanks!
$1,500 USD in 1 day
7.7
7.7

HI 25 years’ experience | Solution: I will revise the MEP design for your City of Gunnison project to improve coordination, compliance, and constructability—ensuring systems integrate cleanly with architectural and structural elements. ✅ Solution: Updated, clash-free MEP plans with coordinated layouts and clear documentation ready for review or execution. Questions: 1️⃣ Do you have the existing MEP drawings and architectural plans to revise? 2️⃣ Are there code or local standard requirements specific to Gunnison that must be followed? 3️⃣ Preferred deliverables (Revit/CAD, schedules) and timeline? We will work as per Freelancer.com’s terms and policies. Warm regards, The Blend Nation
$750 USD in 1 day
7.1
7.1

Dear Sir, Please contact me to get started. Thank you. I am a Professional MEP Engineer with 17+ years of experience in Mechanical, Electrical & Plumbing (MEP) design, drafting and installation. I have successfully completed the design and installation of Plumbing, Water Supply, Drainage, Sewerage, Fire Protection and detection System, Fire Alarm, Firefighting, HVAC and Electrical system for various Residential and Commercial Projects as per standards and specifications. I have all the technical skills, experience, and practical project management skills to complete your task professionally and quickly. I will provide all aspects of Plumbing and Fire Protection System Design in AutoCAD and Revit. Mechanical 1. Detailed Plumbing System Designs (Water Supply & Drainage Layouts, Septic tank, Piping Layouts, Sewerage, Irrigation, Storm water and more) 2. Fire Detection & Fire Protection as per NFPA (Sprinklers, Alarms, Fire Hose Reel System, Fire Hydrant System, Fire Hydraulic Calculations Report and more) 3. Complete HVAC System Design (Heating and Cooling Load Calculations, Layouts, Chillers, Split System and more) 4. Complete Electrical Design (Lighting and Power Layouts, SLD, Fire Alarm, ELV and more) 5. Equipment Installation Detail Drawings 6. Design Calculations 7. Shop Drawings 8. Electrical System 9. Technical Specification 10. Take off sheets, BOQs and More
$1,200 USD in 7 days
6.4
6.4

Hi I am a Civil Engineer with direct experience addressing Colorado municipal plan-review comments and preparing approval-driven permit resubmittals. I will methodically respond only to comments 5, 8, 9, 13, 15, 16, and 17, focusing strictly on civil and plumbing coordination for sanitary sewer, domestic water, and natural gas systems. My work will be based entirely on your existing PDF and native CAD files, revising drawings, riser diagrams, schedules, and calculations only where required. I will prepare a clear, concise response letter that cross-references each City of Gunnison comment to the exact revised sheet and detail. I can provide a Colorado PE stamp, communicate clearly by phone, and deliver a clean, permit-ready resubmittal without scope creep. I am available immediately and can complete this within one week or sooner, and I am happy to briefly summarize relevant Colorado project experience upon request.
$1,000 USD in 7 days
5.1
5.1

Hello, I can assist with your City of Gunnison permit resubmittal by addressing comments 5, 8, 9, 13, 15, 16, and 17 on your civil/MEP plans. I will revise only the existing plumbing and civil drawings—sanitary sewer, domestic water, and natural gas—update calculations or details where necessary, and produce a permit-ready resubmittal package that satisfies City code without redesigning from scratch. Deliverables include updated CAD sheets, riser diagrams, schedules, supporting calculations, and a clear comment-response letter. I am a licensed Colorado PE, experienced with municipal plan reviews, and can provide stamped PDFs and native CAD files promptly.
$750 USD in 2 days
4.3
4.3

I understand the urgency and precision needed for your project, which aligns well with my extensive experience in the engineering field. Being a licensed Colorado Professional Engineer (PE) with a demonstrated understanding of Colorado municipal review processes, specifically within the sanitary sewer, domestic water, and natural gas piping layout areas, I am confident that I can effectively and efficiently address comments 5,8,9,13,15,16, and 17. Throughout my career, I have successfully worked on projects ensuring utility separations, slopes, cleanouts, and code coordination were meticulously executed. The targeted correction effort your project requires aligns with my keen eye for detail and my ability to use existing drawings effectively. Whether it's interpreting red-lined plans or working with native CAD files and PDFs to maintain precision and make necessary revisions without introducing scope creepements enhancements where necessary.
$750 USD in 7 days
3.8
3.8

Hello Client, I’m El Shaer, an architect with 15+ years specializing in luxury 3D Rendering, Interior Design, and Architectural Visualization. I’ve delivered multiple standout projects in your country, and you’ll find their quality reflected in my portfolio. My work is designed to give you more than images—it gives you a preview of the future. Textures, lighting, materials, atmosphere, every element is fine-tuned to make your design feel tangible and alive. Your project deserves a visual experience that inspires confidence. Let’s create something unforgettable together. El Shaer
$750 USD in 3 days
4.5
4.5

Hello, I am a licensed Colorado Professional Engineer (PE) with experience in Colorado municipal plan review, and I can help you address the specific comments related to your sanitary sewer, domestic water, and natural gas piping layout. I’ll focus on comments 5, 8, 9, 13, 15, 16, and 17 and ensure the necessary revisions are made to your existing plumbing/civil drawings, while adhering strictly to the City of Gunnison code requirements. I’ll work directly from your red-lined plans and the official plan-check report, updating the piping layouts, riser diagrams, and schedules as required, and preparing the permit-ready resubmittal package. I will provide the stamped Colorado PDF set along with the native CAD files, ready for direct upload to the city portal. My approach will be thorough, efficient, and on-time. I can provide a quick turnaround—1 week max, if not sooner. Looking forward to assisting with this time-sensitive project! Best regards, Juan
$750 USD in 7 days
3.2
3.2

I am a U.S.-based Civil Engineer with active Colorado PE licensure and direct experience responding to Colorado municipal plan-review comments. I understand this is a focused resubmittal, limited strictly to comments 5, 8, 9, 13, 15, 16, and 17, with no redesign or scope expansion. What I will do Address each specified City of Gunnison comment methodically Revise existing sanitary sewer, domestic water, and natural gas plans only where required Update layouts, risers, schedules, and calculations tied directly to the comments Prepare a clear comment-response letter cross-referencing sheets and revisions Deliver a permit-ready, Colorado-stamped PDF set plus native CAD files Timeline Available immediately Turnaround: 3–5 business days (within your 1-week requirement) Qualifications Colorado PE (able to stamp) Experience with Colorado municipal reviews and utility coordination Strong command of separations, slopes, cleanouts, and code compliance Efficient working from redlines and existing documents Available for phone communication (USA-based) I can begin as soon as you provide the redlined plans and City comment letter and will focus on closing approval cleanly and quickly.
$1,200 USD in 21 days
0.0
0.0

oakland park, United States
Payment method verified
Member since Aug 17, 2022
$1500-3000 USD
$750-1500 USD
$750-1500 USD
$30-250 USD
$750-1500 USD
$250-750 USD
₹600-1500 INR
£250-750 GBP
$250-750 USD
₹1500-12500 INR
$10-30 USD
$1500-3000 AUD
₹750-1250 INR / hour
₹1500-12500 INR
$30-250 USD
$10-70 USD
$15-25 USD / hour
₹1500-12500 INR
€250-750 EUR
$30-250 USD
£20-250 GBP
$250-750 USD
$250-500 USD
$30-250 USD
$250-750 USD