
Käynnissä
Julkaistu
Maksettu toimituksen yhteydessä
I require a concise Bill of Quantities that covers the groundwork, formwork and concrete work for a handful of footings and their associated excavation. All measurement must follow the ANZSS rules and the take-off has to be completed directly in CostX. Scope The drawings are ready and the package is small, limited to excavation, footing concrete, reinforcement, formwork and any incidental items that ANZSS requires to be shown. No other trades are involved. If you are comfortable working in CostX under ANZSS and can meet the two-day window, this should be a straightforward assignment.
Projektin tunnus (ID): 40358810
2 ehdotukset
Etäprojekti
Aktiivinen 3 päivää sitten
Aseta budjettisi ja aikataulu
Saa maksu työstäsi
Kuvaile ehdotustasi
Rekisteröinti ja töihin tarjoaminen on ilmaista

Dear Sir, I am a Senior Quantity Surveyor with 25+ years of experience in BOQ preparation and cost estimation. I can provide accurate quantities using Excel/Bluebeam as per ANZSMM standards, including excavation, concrete, reinforcement, and formwork. I ensure clear documentation and timely delivery. I am ready to start immediately.
₹7 500 INR 2 päivässä
0,0
0,0
2 freelancerit tarjoavat keskimäärin ₹4 500 INR tätä projektia

Hello, I’d be a strong fit for this assignment—preparing **accurate BOQs using CostX in line with ANZSS measurement rules** is exactly the kind of work I handle. I understand that precision and compliance are critical here, especially for a **focused scope involving excavation, footings, concrete, reinforcement, and formwork**, with no scope creep into other trades. --- **What I will deliver:** • A concise, fully measured **Bill of Quantities prepared in CostX** • All quantities aligned strictly with **ANZSS rules of measurement** • Clear breakdown of: * Excavation (including allowances where required) * Concrete (footings) * Reinforcement * Formwork * Any incidental items per ANZSS standards • Clean, structured output ready for pricing --- **My approach:** * Review drawings carefully and set up CostX workbook * Perform detailed take-off with correct classification * Ensure compliance with ANZSS measurement guidelines * Cross-check quantities to eliminate discrepancies * Keep BOQ concise but complete (no overcomplication) --- **Why I’m a strong fit:** • Experience with **CostX take-offs and BOQ preparation** • Familiarity with **ANZSS measurement standards** • Strong attention to detail (critical for quantity accuracy) • Ability to deliver within tight timelines --- **Timeline:** I can complete the full take-off and BOQ within your **2-day window**, ensuring accuracy and compliance. ---
₹1 500 INR 7 päivässä
0,0
0,0

Mumbai, India
Liittynyt huhtik. 9, 2026
₹600-1500 INR
$250-750 USD
₹1500-12500 INR
₹12500-37500 INR
₹12500-37500 INR
₹750-1250 INR/ tunnissa
$14-30 NZD
$30-250 AUD
$1500-3000 CAD
$250-750 AUD
₹5000-10000 INR
₹20000-100000 INR
$250-750 USD
€250-750 EUR
₹12500-37500 INR
$30-250 NZD
$250-750 USD
$30-250 USD
$1500-3000 USD
₹12500-37500 INR
$250-750 USD