I need the logic inside my Schneider Modbus controller refreshed. At the moment the system relies on pressure sensors that scale from 0-70; that scale must be expanded to 0-100 and reflected everywhere the readings drive valve operation. Once the new range is in place, I want to refine the existing ladder/structured-text so the valves respond correctly to the updated values. You will connect through our secure remote tunnel, modify the logic, download it to the PLC, and stay online while we cycle the plant to confirm everything behaves as expected. After that, please add several on-screen quick buttons that trigger the valve-activation logic directly, giving operators a faster way to open or close individual lines without navigating deep menus. Deliverables • Updated sensor scaling to 0-100 • Revised control logic with full functional test • Custom quick buttons that activate the required valve logic • A brief hand-off note so we can maintain the changes going forward When you reply, highlight your experience performing similar Modbus or Schneider PLC updates and any remote commissioning you have handled; that will help me move quickly to award the work.
Project ID: 40321621
54 proposals
Remote project
Active 2 mos ago
Set your budget and timeframe
Get paid for your work
Outline your proposal
It's free to sign up and bid on jobs
54 freelancers are bidding on average €45 EUR/hour for this job

Hi, I can refresh your Schneider Modbus logic to scale readings from 0-70 up to 0-100 and propagate this change to all valve control paths. I will refine the ladder/structured-text so valve actuation matches the new range and perform a full functional test during remote commissioning via your secure tunnel. I will download the updated logic to the PLC, stay connected for cycle tests, and deliver on-screen quick buttons to directly open/close individual lines for operator speed. I have hands-on experience with Modbus, Schneider PLCs, and remote commissioning in live plants. I have completed similar updates, validating scaling, control loops, and operator UI bits under real plant loads. I will provide a concise hand-off note to help your team maintain the changes. What I will deliver: • Updated sensor scaling to 0-100 • Revised control logic with full functional test • Custom quick buttons to trigger valve logic • Brief hand-off document What is the expected time window for the on-site plant cycle during the verification tests, and are there any safety interlocks we must preserve during the update? Best regards,
€21 EUR in 27 days
8.0
8.0

Hello, I understand you need to update the Modbus controller logic on your Schneider system, expanding the pressure sensor scale from 0-70 to 0-100, and then adjust the valve control accordingly. I will connect via your secure remote tunnel, update and test the ladder/structured-text code live with plant cycling to ensure everything works perfectly. After that, I'll create quick on-screen buttons for operators to easily control valves without digging through menus. I’ve done similar updates and remote commissioning on Modbus and Schneider PLC systems, so I’m confident I can deliver this smoothly with clear hand-off notes for future maintenance. Can you provide the current PLC firmware version and any existing documentation for the control logic? What specific valve types and protocols are used for activation? Are there any safety or interlock conditions we need to keep in mind while updating the logic? Do you have a preferred method or tool for the remote connection setup? Is there a timeline or critical plant operation window for completing this update? Thanks,
€21 EUR in 29 days
7.1
7.1

With over a decade of versatile experience, my name is Metin and I am confident in my ability to tackle your project. As an electrical engineer specializing in Modbus systems and Schneider PLCs - I have extensive experience with precisely the kind update you need. I am well-versed in remote commissioning, having fine-tuned my skills to ensure prompt and effective troubleshooting. My expertise include Digital Motor Control, Analog Design, Electronic Design, Power Electronics as well as significant experience with PCB design and Embedded systems - skills crucial to delivering the results you need. I have also worked within the renewable energy sector which has allowed me to refine my understanding of sustainable solutions, such as your inclination to broaden the scaling capability, adhering effectively to the new industry standards. The completion of this project will not only entail updated sensor scaling for wider range at 0-100 but efficient cohesive logic that responds appropriately to the altered values. I will also develop on-screen quick buttons for faster valve control. Finally, I will provide an detailed, yet concise hand-off note enabling seamless maintenance on your part going forward. I assure you with me you are 'not' merely getting a remote engineer however my constant availability during the cyclic testing will ensure smooth transitions and a confirmed functional satisfactory system.
€25 EUR in 20 days
7.4
7.4

Hello, Your current issue is clear: scaling change from 0–70 to 0–100 will directly affect valve thresholds, and without properly updating the logic everywhere, it can lead to incorrect valve behavior or instability during operation. I will update the analog scaling across the entire Schneider PLC logic, then carefully revise the ladder/ST control so all valve responses remain accurate and stable with the new range. After implementation, I will connect via your secure remote tunnel, download the logic, and stay online to support full live plant testing. I will also design and integrate operator-friendly quick buttons in the HMI/SCADA to directly trigger valve actions, improving usability and response time. You will receive tested logic, updated scaling, and a short handover note for future maintenance. I have extensive experience with Schneider PLCs, Modbus systems, and remote commissioning, including live plant debugging and control optimization. Regards, Engineer Muhammad Usman
€27 EUR in 40 days
6.8
6.8

With extensive experience in Modbus systems and PLC updates, I am well-suited to take on your Schneider Modbus Logic Update project. I have worked on similar projects numerous times before, and delivered excellent results every time. My experience includes scaling sensors, rewriting ladder/structured-text, conducting thorough functional tests, and creating customized user interfaces - all of which align directly with your project requirements. Additionally, my solid foundation in electrical engineering paired with my expert fluency in C programming language give me the ability to understand complex systems like the one you're working with. I am proficient in communication protocols such as UART, SPI, Ethernet, USB and, of course, MODBUS. My strong attention to detail will ensure a precise update of the sensor scaling across all relevant areas for unwavering consistency. Lastly, my dedication doesn't end at delivering the final product. It continues by providing strong post-project support to ensure the changes made are easily understood and maintainable going forward. This includes producing comprehensible hand-off notes as requested in your project brief. With me on board for your Modbus Logic Update, you can expect nothing short of exceptional work and seamless collaborations.
€27 EUR in 40 days
6.7
6.7

Hi, KINDLY READ THROUGH MY PROPOSAL THIS IS WHAT I WILL DO - Remotely connect via your secure tunnel to the Schneider Modbus PLC. - Update all pressure sensor scaling from 0-70 to 0-100 across raw input, engineering units, setpoints, alarms, and valve control logic (both ladder and structured text). - Refine valve response logic for the new range, ensuring smooth, stable operation. - Add on-screen quick buttons (direct valve open/close commands) on the existing HMI. - Stay online during plant cycle test to verify correct valve behavior, scaling, and quick-button functionality. - Deliver fully commented updated project, test report, and short hand-off note for your team. RELEVANT PROJECTS - 2025: Schneider M241 Modbus project – expanded sensor scaling (0-50 → 0-100) and added HMI quick buttons for valve control; remote commissioning completed in one session. QUESTIONS - Exact Schneider PLC model (M221, M241, M340, etc.) and EcoStruxure version? - Do you have the current project file ready to share? - Any specific valve logic details or alarm thresholds that must stay unchanged? - Preferred time for remote session? Schneider Modbus & EcoStruxure specialist with extensive remote commissioning experience. Can start as soon as you confirm access and share the project file. Typical turnaround: 2–4 days. Ready to get your system updated and reliable. Let’s schedule the remote session!
€20 EUR in 40 days
6.5
6.5

Hello I am not writing long AI texts . I am experienced automation engineer. You can check my portfolio and we can discuss details. Thank you
€27 EUR in 40 days
6.4
6.4

With over 10 years of experience in web and mobile development, including expertise in Modbus and Schneider PLC systems, I understand the importance of updating the logic inside your Schneider Modbus controller. The current system's reliance on pressure sensors scaling from 0-70 needs to be expanded to 0-100 to ensure accurate valve operations. I will remotely connect, modify the logic, test it thoroughly, and add quick buttons for easier valve control, all while staying online to confirm smooth plant cycling. In the past, I have successfully handled similar Modbus and Schneider PLC updates, with a proven track record in remote commissioning. My precise attention to detail and hands-on approach will ensure the successful completion of your project within the specified budget and timeline. Let's discuss further details and get started on enhancing your Schneider Modbus controller. Feel free to message me here to kick off the process seamlessly.
€28.80 EUR in 15 days
5.9
5.9

The professional with 16 years of experience in Industrial Automation. ^^Development,Commissioning of PLC Control System, HMI and SCADA^^ ◾PLC- Siemens [S7-1500F/H, S7-400, S7-400F/H/R, S7-300, S7-1200, S7-200, S5, TI PLC, LOGO!] Rockwell [(Allen Bradley)- SLC500,MicroLogix,CompactLogix.] Schneider [Zelio, M171/72] Automation Direct [DirectLogic Click PLC] Unitronic [V200-18-E3XB Controller] Delta [Delta DVP ES2] Click [C2 series] ◾HMI- Siemens ** Weintek ** Kinco ** Unitronics ** Hitachi ** Schneider ** Wecon ** DeepSeaElectronics** EZ Automation**Maple ◾SCADA - WinCC ** In-Touch Wonderware ** Citect ** Ignition ◾VFD- Siemens, Rockwell-AB, ABB, Telemechanique, SEW and Danfoss, Hitachi ◾ Industrial Networks- PPI-MPI ** Profibus ** AS-i ** Profinet ** Ethernet ** Modbus RTU/Modbus TCP ◾ OPC - PC Access ** OPC Scout ** OPCUA ** Metrikon ** Kepware ◾ Project Documentation- ISA88/95, GAMP, 21CFR Part11, VP, URS, FRS, DS, IQ, OQ, PQ, SOP. ◾ Programming Languages - C# ** VBA ** VB.net ** Javascript ** Python ◾ Arduino Uno ** RS485 ** Ethernet shield ** Data Logging ◾Raspberry pi ** Raspi Camera ? Networking Devices - Siemens ** Teltonika **NO OFFSITE COMMUNICATIONS**
€27 EUR in 40 days
5.9
5.9

Hi, how are you doing? I went through your project description and I can help you in your project. your project requirements perfectly match my expertise. We are a team of Electrical and Electronics engineers, we have successfully completed 1000+ Projects for multiple regular clients from OMAN, UK, USA, Australia, Canada, France, Germany, Lebanon and many other countries. We are providing our services in following areas: Antenna Design (CST, HFSS) Embedded C Programming. VHDL/Verilog, Quartus/Vivado, LabVIEW/ Multisim/PSPICE/VLSI MATLAB/SIMULINK Network Simulator NS2/NS3 Microcontroller like Arduino, Raspberry Pi, FPGA, AVR, PIC, STM32 and ESP32. IDEs like Keil MDK V5, ATmel studio and MPLab XC8. PLCs / SCADA PCB Designing Proteus, Eagle, KiCAD and Altium IOT Technologies like Ethernet, GSM GPRS. HTTP Restful APIs connection for IOT Communications. Also, we have good command over report writing, I can show you many samples of our previous reports. Kindly consider us for your project and text me so that we can further discuss specifically about your project's main goals and requirements.
€27 EUR in 40 days
6.2
6.2

Hello, We, CanadaTronix an automation company based in Canada and US. We have experts in PLC/HMI/SCADA and related control and instrumentation work for automation systems. please see our profile to learn about dozens of completed projects with amazing feedback from our past clients. We have gone through the project description and are confident that we can work your project and deliver all requirements on time and quality. Regards,
€27 EUR in 40 days
6.3
6.3

I have 10+ years working with Schneider PLCs (Modicon M340/M580) and Modbus TCP/RTU systems, delivering 40+ production updates including live scaling changes and remote commissioning with zero unplanned downtime; in one project I re-scaled 120+ analog channels and reduced valve response deviation by 35%. Approach ✅ I will audit the current 0–70 scaling implementation at the analog input and normalize it to 0–100, ensuring consistent engineering units across all dependent registers and HMI tags. ✅ I will trace all logic paths (ladder/ST) where the pressure values drive valve states, updating thresholds, comparators, and interlocks while preserving safety conditions. ✅ I will deploy the updated program via secure tunnel, perform live validation during plant cycling, and tune response behavior based on real-time feedback. ✅ I will implement HMI quick-action buttons mapped to existing valve logic with proper interlock checks and operator-safe overrides. Questions ✅ I need the exact PLC model, firmware, and whether the project is in EcoStruxure Control Expert or another environment. ✅ I need confirmation of how scaling is currently implemented (raw counts vs engineering units, and any existing function blocks). ✅ I need access details for the HMI system to align tag mapping and implement the quick buttons correctly. ✅ I need clarification on any safety interlocks or permissives that must not be bypassed by manual controls. Best, Yaroslav
€30 EUR in 40 days
5.0
5.0

With my diverse skill set, ranging from Automation to Electrical Engineering, I believe I am the ideal candidate to handle your Schneider Modbus Logic update. Throughout my career, I have consistently tackled intricate projects, including but not limited to wastewater and water treatment plant automation with Siemens TIA Portal program, WinCC SCADA program, and more. My extensive experience with Siemens means I can effortlessly comprehend your needs for sensor scaling and control logic revision. Plus, I’ve been well-versed in remote commissioning, hence the secure remote tunnel connection is not a problem. In addition to upgrading your system in line with your specified 0-100 scale, I propose integrating on-screen quick buttons for more efficient valve control. These buttons will ensure operators can effortlessly open or close individual lines without having to navigate through layers of menus. More so, my experience working with installations/utilities as well as testing and commissioning will be advantageous during the crucial functional test phase. Lastly, my methodical nature leads me to produce detailed hand-off notes, ensuring you can continue maintaining the changes we implement going forward.
€27 EUR in 40 days
5.4
5.4

⭐⭐⭐⭐⭐ I can handle this update remotely and keep it practical: first correct the 0–70 to 0–100 sensor scaling, then trace everywhere those values are used so the valve logic, limits, and operator actions still behave correctly after the change. My approach: Review the current Schneider/Modbus logic and HMI links Update scaling blocks and any dependent math/thresholds Adjust ladder/ST valve logic so responses remain correct with the new range Add quick-action HMI buttons that call the proper valve routines, not just force bits unsafely Stay online during plant cycling for live verification and tuning Provide a short hand-off note with what changed I’ve handled remote PLC/HMI changes, live commissioning support, and logic revisions where scaling updates affect downstream control behavior. I understand the importance of making changes carefully on a running system and verifying every related function before signoff. Quick questions: • Which Schneider platform is this exactly (M221/M241/M340/etc.)? • Is the HMI Schneider as well, or third-party? • Are the valves discrete open/close, or modulating with analog feedback? If access is ready, I can move quickly and keep the changes clean and maintainable.
€27 EUR in 40 days
4.5
4.5

Best Remote Schneider Modbus Design Expert! ⭐⭐⭐⭐⭐ Hi, I specialize in Schneider PLC and Modbus system updates, including remote commissioning for live plant operations. I understand that scaling your pressure sensors from 0–70 to 0–100 is not just a math update—it affects every dependent valve logic, and any mismatch could impact plant safety. I would approach this by first mapping all points where the sensors drive valve actions, updating the ladder/structured-text logic, and verifying each interaction through your secure remote tunnel. Once the scaling is correct, I will add operator-friendly quick buttons for direct valve control and provide a concise hand-off note for ongoing maintenance. A couple of clarifying points to ensure seamless execution: 1. Are there any interlocks or safety conditions that must remain unchanged during the logic update? 2. Should the quick buttons include visual feedback for valve state or only trigger actions? I can perform the update remotely, validate it live during plant cycling, and ensure everything behaves exactly as expected. I’ve handled similar Schneider PLC Modbus updates and remote commissioning projects successfully and can deliver this safely and efficiently. Best regards, Prat PCB Must Innovations
€25 EUR in 40 days
6.3
6.3

Hi there, I reviewed your requirements and I’m a senior automation/PLC engineer with 7+ years of experience working with Schneider systems (Modicon/M340/M580), Modbus communication, and remote commissioning. I’ve performed multiple live system updates involving scaling changes, valve control logic tuning, and HMI enhancements without disrupting plant operation. Approach - I will update all pressure scaling (0–70 → 0–100) consistently across logic, ensuring no broken dependencies - I will refine ladder/ST logic so valve control responds correctly to the new range (including thresholds, interlocks, and safety conditions) - I will connect via your secure remote tunnel, deploy changes, and support live plant testing/validation - I will implement HMI quick-action buttons for direct valve control with proper safeguards - I will provide a clear handover note documenting changes for future maintenance I focus on safe live updates, clean logic structure, and reliable operation under real conditions. Questions - Which Schneider platform (EcoStruxure Control Expert, SoMachine, etc.)? - HMI type (Magelis, Web HMI)? - Any critical uptime constraints during deployment? Best regard
€20 EUR in 40 days
3.9
3.9

Hello, I'm Hoan, an Industrial Automation Engineer with 6 years of experience in development, programming, and commissioning of PLC control systems, HMI, and SCADA applications for industrial automation projects ✅PLC Programming : Siemens: S7-1500F/H, S7-400, S7-400F/H/R, S7-300, S7-1200, S7-200, S5, LOGO! Rockwell (Allen-Bradley): SLC500, MicroLogix, CompactLogix Schneider: Zelio, M171, M172 Delta: DVP-ES2, DVP-SA2, DVP-SA Mitsubishi: A Series, Q Series, FX Series LS: XGB, XBC, Master K200, Master K300 Omron: CP Series, CJ Series Inovance: H1U, H2U, H3U, H5U, H6U] ✅HMI Development : Siemens -- Weintek -- Schneider -- Wecon -- Proface -- Inovance ✅SCADA Systems : WinCC -- In Touch Wonderware -- Ignition -- SCADA C# -- GENESIS64 ✅VFD / Inverter Integration : Siemens -- ABB -- Danfoss -- Hitachi --Delta -- Mitsubishi -- LS -- Schneider ✅ Industrial Communication : PPI-MPI -- Profibus -- AS-i -- Profinet -- Ethernet/IP -- Modbus RTU/Modbus TCP ✅ OPC Communication : PC Access -- OPC Scout -- OPCUA -- Kepware ✅Programming Languages : C# -- VBA -- VB.net -- Javascript -- Python -- VBS ✅ Embedded / IoT Arduino Uno ** RS485 ** Ethernet shield ** Data Logging ✅Contact Feel free to contact me for more information. Ready to support your project. I look forward to working with you. Regards,Hoan
€26 EUR in 40 days
3.6
3.6

Hi Client, I’ve read the brief and can update your Schneider Modbus logic to extend pressure scaling from 0-70 to 0-100, adjust all dependent comparisons and PID/threshold logic, and refine the ladder/Structured Text so valves respond predictably to the new range. I have hands-on experience with Schneider (Unity/SoMachine/MegaSysX), Modbus register mapping, and remote commissioning through secure tunnels; I’ve implemented sensor re-scaling, updated ST/LD blocks, downloaded firmware, and witnessed live plant cycles to confirm behavior. My approach: I’ll map and version current registers, apply the 0-100 scaling across logic and HMI bindings, refactor any fragile ladder/ST sequences to clear set/reset and interlocks, then download and remain online while you cycle the plant to validate. Finally I’ll add operator quick buttons tied to the same validated valve logic and provide a concise hand-off note describing changes and maintenance tips. Do you already have the secure tunnel credentials and a preferred window for a supervised plant cycle? Best regards, Daniel
€43 EUR in 18 days
3.4
3.4

Greetings! I’m a top-rated freelancer with 16+ years of experience and a portfolio of 750+ satisfied clients. I specialize in delivering high-quality, professional remote Schneider Modbus logic updating services tailored to your unique needs. Please feel free to message me to discuss your project and review my portfolio. I’d love to help bring your ideas to life! Looking forward to collaborating with you! Best regards, Revival
€18 EUR in 40 days
3.3
3.3

Hello, The main engineering challenge here is ensuring that the updated scaling from 0-70 to 0-100 is seamlessly integrated across all relevant systems, particularly in the existing valve control logic. Another complexity is maintaining the reliability of real-time responses during the plant cycling process, especially when modifying ladder and structured text logic. Could you clarify if the current logic has provisions for dynamic scaling adjustments, or will this need to be entirely restructured? Additionally, what are the specific requirements for the on-screen quick buttons, particularly in terms of user access and operational safety? I look forward to discussing the intricacies of your system further.
€18 EUR in 40 days
2.7
2.7

Gambassi Terme, Italy
Payment method verified
Member since Mar 24, 2026
$240-2000 HKD
€250-750 EUR
€6-12 EUR / hour
₹250000-500000 INR
₹4000-8000 INR
₹3500-7000 INR
$30-250 NZD
₹150000-250000 INR
$250-750 USD
₹12500-37500 INR
$25-50 USD / hour
₹600-1500 INR
min £100000 GBP
$15-25 USD / hour
$30-250 USD
€30-250 EUR
₹1500-12500 INR
$30-250 USD
₹12500-37500 INR
$250-750 AUD
$10-30 USD
$250-750 USD
$250-750 USD