Käynnissä

Migration of Vtiger from 4.2 to 5.0.3

Hi experts,

We are looking for some one to migrate our VtigerCRM to the latest version.

The vtiger is on top of elastix (h[url removed, login to view])

It is very important that the transition is smooth, We are ready to face some down time for 6 to 8 hours.

This can be done after business hours here in australia.

Please bid only if you have had any experience in Vtiger.

Update to be done today,. 12 Aug 2009

$ 50 is the budget.

Taidot: Linux, PHP, Järjestelmänvalvoja

Näytä lisää: admin australia, vtiger, face today, elastix, migrate vtiger version, elastix php, australia php, vtigercrm elastix, php face, elastix vtigercrm, australia admin, migration vtiger, vtiger time, latest system, australia business, bid php experts, php transition, vtiger version php, php vtiger, elastix vtiger, business system, australia migration, vtiger elastix, php australia, vtiger update

About the Employer:
( 10 reviews ) Canberra, Australia

Projektin tunnus: #487062

Myönnetty käyttäjälle:

coolkidz

i have experience in elastix voip server and intense skill in mysql. i'm pretty sure that i can do this as fast and good quality as possible. please consider me.

30 $ USD 1 päivässä
(0 arvostelua)
0.0

1 freelanceria on tarjonnut keskimäärin 50 $ tähän työhön

SoftEngineer

Hi, please check PM.Thanks

50 $ USD 1 päivässä
(251 arvostelua)
8.1