Suljettu

SQL Server 2016 migration to Oracle 19c using GoldenGate 19.1

My source database is SQL Server 2016 SP2 Standard Edition and my source database is Oracle 19c. I have successfully migrated from SQL Server to SQL Server using GoldenGate 19.1, but the migration from SQL Server to Oracle is just frustrating me and I need this to be implemented using the Initial Load process and then the use of LSN from SQL Server. The Oracle schema has been tested to work fine for the data migration from SQL server to Oracle using a Linked Server for small database size.

But I need to use GoldenGate 19.1 along with the LSN implementation (not HANDLECOLLISIONS) for the SQL Server 2016 SP2 migration running on Windows 2012 Server to Oracle 19c running on Linux x86-64 v7.6.

Taidot: Oracle, Microsoft SQL Server, Linux

Näytä lisää: migration oracle sql 2005, data migration oracle sql server 2005, convert sql server 2005 script oracle, converting sql server scripts 2005 oracle, sql server 2008 migration project plan, create oracle database using sql, sql server 2016 r, ms sql server 2016, SQL server 2016, sql server 2016 cluster, step-by-step installation of sql server 2016 on a windows server 2016 failover cluster - part 1, sql server 2016 failover cluster installation step by step, how to import dmp file in oracle 11g using sql developer, sql server 2016 running total, windows server 2016 migration, sql server 2016 data migration assistant download, sql server 2008 to 2016 migration checklist, how to create linked server in sql server 2016 for oracle, sql server 2005 to 2016 migration steps, oracle 19c database link to sql server

Tietoa työnantajasta:
( 0 arvostelua ) Waterways, Australia

Projektin tunnus: #30633191

8 freelanceria on tarjonnut keskimäärin $683 tähän työhön

ShafirR

Hi! When viewing your job details, it really jumped out at me. In my current Professional Microsoft SQL Server DBA role, I have extensive experience with Migrate SQL Server Database Local Servers on-premises to Oracle Lisää

$500 AUD 1 päivässä
(28 arvostelua)
5.0
rexzetsolutions

i have lots of work with SQL Server and Oracle so i got it your task let me know i am ready to start wok from now.

$610 AUD 3 päivässä
(16 arvostelua)
4.5
merinsinha

I can do it. Senior oracle , SQL Expert. As 9+ years experiences in these field. I can give good quality work. I have read the guidelines of your work.I believe that i can provide you the best quality works you are ant Lisää

$500 AUD 3 päivässä
(8 arvostelua)
3.7
bmoatar1

Hi, how are you doing now? I have good experience with MS SQL and PL/SQL. I have developed several database programming using Oracle 18c Edition. I have interested to your project. I hope to contact with you for detail Lisää

$500 AUD 7 päivässä
(3 arvostelua)
1.2
(1 arvostelu)
1.1
svenkadesh20

hi, I have 9+yrs of experience in oracle core and APPS database administration,oracle database migration, upgradation,single instance and cluster configuration (ORACLE RAC), Dataguard,Golden gate ,OCI cloud,SQL server Lisää

$750 AUD 7 päivässä
(0 arvostelua)
0.6
(0 arvostelua)
0.0
sathyamithram

If we can use Microsoft Data tools and if you feel ok with making SSIS packages for this project, I can work on this

$1000 AUD 10 päivässä
(0 arvostelua)
0.0