Find Jobs
Hire Freelancers

Preliminary Construction Project Scheduling

₹600-1500 INR

Suljettu
Julkaistu noin 2 kuukautta sitten

₹600-1500 INR

Maksettu toimituksen yhteydessä
I've created a preliminary construction schedule in Primavera, but I need help refining and polishing it for an hour.
Projektin tunnus (ID): 37809730

Tietoa projektista

6 ehdotukset
Etäprojekti
Aktiivinen 15 päivää sitten

Haluatko ansaita rahaa?

Freelancerin tarjouskilpailun edut

Aseta budjettisi ja aikataulu
Saa maksu työstäsi
Kuvaile ehdotustasi
Rekisteröinti ja töihin tarjoaminen on ilmaista
6 freelancerit tarjoavat keskimäärin ₹2 267 INR tätä projektia
Käyttäjän avatar
Dear Sir , I have over 12 years of experience in planning and cost control in major industrial projects, and I am a professional in developing schedules on Primavera and preparing various project reports such as dashboards in all its forms. I am confident that I have the skills and experience you are looking for. I am proficient in Primavera P6 software, and I have a proven track record of developing accurate and efficient reports . I am also able to meet tight deadlines and deliver high-quality work within a short timeframe. PMP CERTIFIED AND MBA IN PROGRESS
₹4 000 INR 1 päivässä
5,0 (2 arvostelua)
3,8
3,8
Käyttäjän avatar
Building a successful data project, such as refining a construction schedule in Primavera, requires someone with not only comprehensive technical skills but also an understanding of the demanding and detail-oriented nature of the industry. With a decade of experience as a dedicated freelancer specializing in Data Analysis and Project Management, I am confident that my skills will be a perfect match for your project. Over the years, I've become well-versed in not just Primavera but also an expansive array of other valuable tools such as MS Office, G-Suite, Power BI, etc. You can expect me to bring all these skills to bear in improving your construction schedule by adding layers of precision and strategic foresight. Furthermore, my commitment to delivering 100% customer satisfaction ensures that your project will always be treated with the highest level of dedication. From providing samples upfront for your confidence to being available 24/7 via Freelancer Messenger for seamless communication, I will go above and beyond to complete the task on time and within budget. Your data dreams have found their ally – let's get started!
₹600 INR 1 päivässä
5,0 (3 arvostelua)
2,7
2,7
Käyttäjän avatar
It is P6 or MS project Schedule ? Happy to assist for an hour or more as needed. Please see my profile, helped out several professional in past also working with PMC in Project Controls. I am looking forward to it. Thanks
₹5 500 INR 1 päivässä
5,0 (3 arvostelua)
2,3
2,3
Käyttäjän avatar
My Schedules are Fool proof and construction friendly. They are based on actual buffers during construction and a realistic scenarios. I use latest Primavera 6.2 Software
₹1 050 INR 7 päivässä
0,0 (0 arvostelua)
0,0
0,0

Tietoja asiakkaasta

Maan INDIA lippu
Muscat, India
5,0
1
Maksutapa vahvistettu
Liittynyt helmik. 10, 2024

Asiakkaan vahvistus

Kiitos! Olemme lähettäneet sinulle sähköpostitse linkin, jolla voit lunastaa ilmaisen krediittisi.
Jotain meni pieleen lähetettäessä sähköpostiasi. Yritä uudelleen.
Rekisteröitynyttä käyttäjää Ilmoitettua työtä yhteensä
Freelancer ® is a registered Trademark of Freelancer Technology Pty Limited (ACN 142 189 759)
Copyright © 2024 Freelancer Technology Pty Limited (ACN 142 189 759)
Ladataan esikatselua
Lupa myönnetty Geolocation.
Kirjautumisistuntosi on vanhentunut ja sinut on kirjattu ulos. Kirjaudu uudelleen sisään.