Find Jobs
Hire Freelancers

Mineral Processing Pre-Feasibility Study (Iron/Aluminium)

$20000-50000 USD

Suljettu
Julkaistu yli vuosi sitten

$20000-50000 USD

Maksettu toimituksen yhteydessä
We’re anticipating the Viability Study will be a high-level study of a mineral processing zone (MPZ) in the Republic of Congo (ROC) over a few months seeking to: • Ascertain whether it is better to establish the proposed iron-ore MPZ, primarily pig iron plant at the mine, or 400km away at the deep-water port at Pointe-Noire • Can the MPZ be serviced with sufficient infrastructure at the mine? • ROM of capex and opex for MPZ (note, 2 nearby hydro schemes are about to commence construction totalling 300MW that could be partially harnessed to power the MPZ) • ROM of capex and opex for MPZ at Pointe-Noire, adjacent to the port. Power supply here would be derived from gas, albeit, development of the ROC’s significant proven gas reserves is very much in its infancy • ROM of capex and opex for an aluminium smelter or integrated smelter/refinery MPZ at Pointe-Noire • High-level technical and commercial assessment as to whether any one or more of the MPZ options are potentially viable. If there is potential viability, then the final step would be to outline the Terms of Reference for a Pre-Feasibility Study for the relevant MPZ development(s). Background: Rather than starting with a PFS from the get-go, we recommend we do a viability assessment first, to see whether it is worth considering such developments. We are broadly defining the study / design gateways as: Viability Study • Primary focus: Why consider the development? • Vision planning of broad options • Rough order of magnitude (ROM) costs +100%/-50% Pre-Feasibility Study • Primary focus: What is the development? • Master planning resolution of 1 or 2 preferred options • CAPEX +/-50% and indicative OPEX Bankable Feasibility Study • Primary focus: How to implement development? Concept design • CAPEX / OPEX +/-30% FEED / Preliminary Design • CAPEX / OPEX +/-20% EPIC / Detailed Design • CAPEX / OPEX +/-10%
Projektin tunnus (ID): 35326064

Tietoa projektista

5 ehdotukset
Etäprojekti
Aktiivinen vuosi sitten

Haluatko ansaita rahaa?

Freelancerin tarjouskilpailun edut

Aseta budjettisi ja aikataulu
Saa maksu työstäsi
Kuvaile ehdotustasi
Rekisteröinti ja töihin tarjoaminen on ilmaista
5 freelancerit tarjoavat keskimäärin $34 700 USD tätä projektia
Käyttäjän avatar
Hi, I am a mining and mineral processing expert, working with various metals in research and plant construction. In formal education, I have my Master's degree in Chemical Environmental engineering from Columbia University. Are you looking for a AACE concept screening estimate, a mining plan, or a economic viability study? What phase in the project are you currently standing in?
$50 000 USD 90 päivässä
5,0 (3 arvostelua)
4,3
4,3
Käyttäjän avatar
Hi there
$28 500 USD 7 päivässä
5,0 (1 arvostelu)
2,3
2,3
Käyttäjän avatar
Hi, Hope you are doing well. We are much expertise group of iOS, Android, Website developers and Designers Please review my profile - https://www.freelancer.in/u/rijutapatidar I understood the initial scope of Mineral Processing Pre-Feasibility Study (Iron/Aluminium). I want to discuss more about this project in order to prepare the final concept. So let’s discuss in detail over chat then we will make a plan to start work on it. Thanks
$35 000 USD 70 päivässä
0,0 (0 arvostelua)
0,0
0,0

Tietoja asiakkaasta

Maan UNITED ARAB EMIRATES lippu
Abu Dhabi, United Arab Emirates
0,0
0
Liittynyt marrask. 25, 2022

Asiakkaan vahvistus

Kiitos! Olemme lähettäneet sinulle sähköpostitse linkin, jolla voit lunastaa ilmaisen krediittisi.
Jotain meni pieleen lähetettäessä sähköpostiasi. Yritä uudelleen.
Rekisteröitynyttä käyttäjää Ilmoitettua työtä yhteensä
Freelancer ® is a registered Trademark of Freelancer Technology Pty Limited (ACN 142 189 759)
Copyright © 2024 Freelancer Technology Pty Limited (ACN 142 189 759)
Ladataan esikatselua
Lupa myönnetty Geolocation.
Kirjautumisistuntosi on vanhentunut ja sinut on kirjattu ulos. Kirjaudu uudelleen sisään.