
Suljettu
Julkaistu
Maksettu toimituksen yhteydessä
I am taking my first real dive into physical design with an open-source PicoRV32 core I cloned from GitHub. So far I have completed the basic floorplan, power grid, and initial placement, but once I move into placement-and-routing inside Innovus the run ends with a long list of DRC violations that I am struggling to interpret and fix. The goal is to finish a clean, sign-off-quality layout while learning industry-standard methodology along the way. I already have access to Genus for synthesis, Innovus for P&R, PrimeTime for STA, and Tempus for sign-off timing; what I lack is the practical know-how to connect the dots, tune the tool settings, and understand the reports. What I need from you • Live or asynchronous guidance focused on Innovus placement and routing, especially strategies to eliminate post-route DRCs. • Review of my current scripts, constraints, and environment files, with explanations of why certain switches or flows matter. • Advice on correlating Innovus, PrimeTime, and Tempus reports so timing closure does not reopen after each iteration. • Quick checkpoints on any related steps (floorplan refinement, power planning tweaks) whenever they block progress. The engagement will be hands-on: I share logs, screenshots, or the design database; you point out the root causes, demonstrate fixes, and suggest best practices I can reuse on future projects. If this matches your expertise in advanced physical design, let’s connect and start clearing those DRCs.
Projektin tunnus (ID): 40338873
1 ehdotus
Etäprojekti
Aktiivinen 19 päivää sitten
Aseta budjettisi ja aikataulu
Saa maksu työstäsi
Kuvaile ehdotustasi
Rekisteröinti ja töihin tarjoaminen on ilmaista
1 freelancerit tarjoavat keskimäärin ₹1 300 INR tätä projektia

Hello, I am a VLSI Physical Design Engineer with hands-on experience in complete backend flow (Floorplan to GDSII) using Cadence Innovus and Tempus. I have worked on placement, CTS, routing, STA, and timing closure, including fixing setup/hold and DRV violations (fanout, transition, capacitance). I can help you with: Timing closure (Setup/Hold fixes) DRV fixing and optimization ECO (buffer insertion, cell sizing) Floorplanning, placement, CTS, and routing tasks I ensure clean, optimized, and signoff-ready results within deadlines. Let’s discuss your project requirements — I’m ready to start immediately. Thank you
₹1 300 INR 4 päivässä
0,0
0,0

Vellore, India
Maksutapa vahvistettu
Liittynyt lokak. 18, 2023
₹600-1500 INR
₹600-1500 INR
₹12500-37500 INR
$30-250 USD
₹1500-12500 INR
₹1500-12500 INR
$15-25 USD/ tunnissa
$250-750 USD
€250-750 EUR
min $100000 USD
$5000-10000 USD
$250-750 CAD
$10-30 USD
₹12500-37500 INR
$250-750 CAD
₹1000-2000 INR
$250-750 USD
₹12500-37500 INR
$750-1500 AUD
$10-30 USD
₹600-1500 INR
£10-20 GBP
$30-250 USD