
Closed
Posted
Paid on delivery
100kw fire pump Generac SD400 generator feeding it with 700A magnetic trip field adjustable Siemens breaker 75’ to fire pump through dedicated transfer switch.
Project ID: 40800913
27 proposals
Remote project
Active 5 days ago
Set your budget and timeframe
Get paid for your work
Outline your proposal
It's free to sign up and bid on jobs
27 freelancers are bidding on average $476 USD for this job

Hello, Electrical engineering and power generation are central to this project, and Live Experts LLC brings over a decade of technical delivery experience across engineering, electronics, industrial automation, and real-world hardware systems. That background aligns directly with designing the power arrangement for a 100 kW fire pump, Generac SD400 generator, 700 A Siemens magnetic-trip breaker, dedicated transfer switch, and the 75-foot feeder connection. Our multidisciplinary engineering capability supports practical coordination between generator power, protection, transfer equipment, and the fire-pump load. Experience with automation, control systems, embedded hardware, and industrial environments also helps ensure the design is technically coherent and suitable for implementation rather than limited to a theoretical drawing. I am ready to provide dependable electrical engineering support for this fire-pump generator power design and would welcome the opportunity to deliver a clear, professionally coordinated solution. Thanks!
$750 USD in 2 days
8.4
8.4

Hi, I understand you need the electrical power arrangement checked for a 100kW fire pump supplied by the Generac SD400 generator, using a 700A field-adjustable Siemens magnetic-trip breaker and a dedicated transfer switch about 75 feet away. I will review the generator and pump data, confirm feeder and breaker sizing, check voltage drop and starting current, and verify that the transfer-switch and emergency power arrangement work together. My Electrical Engineering approach will include clear calculations, connection details, and notes for review. I can also check the control and protection needs around the Microcontroller equipment where applicable, while keeping the Electronics side coordinated with the power system. Is the 100kW fire-pump motor voltage, locked-rotor current, and exact Generac SD400 output data available for sizing and starting-current checks? Please start the chat and let’s discuss the available drawings, equipment data, and required code basis.
$650 USD in 8 days
6.9
6.9

Electrical engineering expertise is directly relevant to developing the power design for your 100 kW fire pump, Generac SD400 generator, Siemens 700 A adjustable magnetic-trip breaker, and dedicated transfer switch connection. My skills include Electrical Engineering, Electronics, Engineering, and Microcontroller-related technical work, supported by access to a broader team of certified technical experts. I can provide focused engineering support for coordinating the generator, breaker, transfer switch, and approximately 75-foot feeder arrangement, with attention to equipment compatibility and a clear, professional design package. I am ready to contribute the electrical design expertise and technical coordination this fire-pump power system requires. Choose me to move this project forward with a capable engineering-focused team.
$250 USD in 1 day
4.9
4.9

Hello, I can assist with the electrical design and analysis of your 100 kW fire pump system, including the Generac SD400 generator, 700A Siemens magnetic-trip breaker, and dedicated transfer switch. I can review the system requirements and provide the necessary calculations and documentation. Best regards
$500 USD in 7 days
4.9
4.9

I have 12+ years of experience in electrical, mechanical, and engineering design documentation. I can review the proposed 100 kW fire pump power supply system, including the Generac SD400 generator, 700A Siemens field-adjustable magnetic trip breaker, dedicated fire pump transfer switch, and 75 ft feeder connection. I will focus on load calculations, generator capacity and motor-starting performance, breaker coordination, feeder sizing, voltage drop, and compliance with applicable NEC and fire pump requirements. I can also prepare technical calculations, equipment schedules, and coordinated electrical drawings for review. Final approval and any required professional engineering certification must be provided by an appropriately licensed engineer. Could you confirm the system voltage, fire pump motor nameplate details (HP, FLA, and starting method), and the transfer switch manufacturer/model? Do you already have the electrical one-line diagram and equipment specifications?
$260 USD in 2 days
3.8
3.8

Thanks for posting the project. With 8 years of relevant electrical engineering and CAD drafting experience, I can help develop the electrical design and documentation for your 100 kW fire pump powered by the Generac SD400 generator. I will review the 700A Siemens adjustable magnetic-trip breaker, dedicated fire pump transfer switch, and the approximately 75 ft feeder route. The work can include the single-line diagram, power connections, cable and conduit routing, equipment coordination, and clear installation drawings. I will also review the available generator and fire pump specifications to identify any compatibility or sizing concerns and document the required details. Please share the fire pump nameplate, generator specifications, breaker model, transfer switch details, and project location so I can assess the requirements accurately. Final design approval and code compliance should be verified by a qualified local electrical engineer. Best Regards Sidra https://www.freelancer.pk/u/sidratulm20
$250 USD in 3 days
3.5
3.5

Hi there, How is the fire pump starting load handled now, and do you need a full NEC 695 one-line review? Is the 75’ run sized for voltage drop and fault current at the pump controller input? The main job here is to confirm the generator, breaker, transfer switch, and feeder all work together for a fire pump duty setup. A clean design review should check starting current, conductor sizing, breaker coordination, and whether the Siemens magnetic trip settings stay within fire pump rules. One risk is that normal protection settings can trip during pump start or be too restrictive for code-compliant fire pump operation. I would verify the full sequence from SD400 output to transfer switch to pump, then tune the protection and feeder details around the actual load data. This kind of work benefits from careful code-based checking and practical field coordination. After the design review, I can help tighten the one-line, confirm assumptions, and flag any items that need engineer approval or utility coordination. Best, Hlib
$555 USD in 5 days
2.4
2.4

Hi, We have an experienced engineering team with expertise in electrical power systems, generator integration, industrial equipment, and technical design documentation. Our approach would be to review the 100 kW fire pump requirements, Generac SD400 generator specifications, 700A Siemens adjustable magnetic-trip breaker, dedicated transfer switch, and 75-foot feeder connection. We'll evaluate motor starting current, generator capacity, breaker coordination, conductor sizing, and voltage drop to identify any potential issues and ensure the system meets the applicable fire-pump electrical requirements. We can provide detailed calculations, a single-line diagram, equipment coordination recommendations, and technical documentation. A few questions before proceeding: 1. What are the fire pump's voltage, full-load amps (FLA), and locked-rotor amps (LRA)? 2. Is the motor across-the-line starting or does it use a soft starter? 3. Do you have the exact Siemens breaker model and transfer switch specifications? We'll review the available details and establish a clear scope and timeline. Best regards,
$350 USD in 1 day
2.0
2.0

Greetings! I can handle the fire pump generator power design for your 100 kW fire pump fed by a Generac SD400 generator through a 700A magnetic trip field-adjustable Siemens breaker, with the 75-foot run to the fire pump through a dedicated transfer switch. I will review the configuration, verify breaker and conductor sizing, transfer switch coordination and code compliance for the fire pump circuit, and deliver the design documentation you need. Please share any existing drawings or site details so I can confirm the requirements and proceed. Thanks, Revival
$250 USD in 7 days
1.5
1.5

Hello, As a Licensed Professional Engineer experienced in MEP coordination, electrical design review, fire-protection requirements, and permit-ready construction documentation, I can develop a clear, code-conscious power design for your 100 kW fire pump and Generac SD400 generator system. I can coordinate the generator output, 700A Siemens magnetic-trip breaker, dedicated transfer switch, and the approximately 75-foot feeder connection to produce practical electrical drawings, schedules, calculations, and supporting documentation. My broader engineering experience includes commercial and light-industrial projects, NEC and NFPA compliance review, equipment coordination, existing-condition assessments, AutoCAD drafting, and signed/sealed packages where permitted by the project jurisdiction. I am ready to provide a technically complete, contractor-friendly design package for review and permitting. Choose me to bring licensed engineering judgment and coordinated documentation to this fire pump power project. Thanks!
$250 USD in 5 days
0.0
0.0

Hello, My licensed Professional Engineer background in electrical engineering and MEP design directly matches your fire-pump generator power design. I can prepare clear, coordinated documentation for the 100 kW fire pump, Generac SD400 generator, 700A magnetic-trip field-adjustable Siemens breaker, dedicated transfer switch, and the 75-foot feeder connection. My experience includes electrical power layouts, equipment schedules, technical documentation, CAD drafting, and coordinated construction and permit drawing packages. I focus on accurate electrical distribution details and practical documentation that supports review, coordination, and installation while aligning with applicable project requirements and codes. I am ready to provide a professional, construction-ready design package for this fire pump generator connection and would be pleased to take on the project. Thanks!
$250 USD in 5 days
0.0
0.0

Your fire pump generator design requires careful electrical engineering to coordinate the 100 kW fire pump, Generac SD400 generator, 700A Siemens magnetic-trip breaker, dedicated transfer switch, and the 75-foot feeder run. Electrical Engineering is my listed specialty, supported by more than 15 years of experience in engineering design, construction drawings, MEP coordination, and technical documentation. I can develop clear, accurate design documentation for the generator-to-fire-pump power arrangement, including equipment coordination, feeder routing, breaker and transfer-switch documentation, and professional CAD deliverables using AutoCAD, Revit, and Bluebeam. My broader construction and building-systems experience helps me produce drawings that are practical for contractors and suitable for project review and documentation. I am ready to apply my detail-oriented engineering and documentation experience to your fire pump generator power design and would be glad to work with you on the project.
$500 USD in 10 days
0.0
0.0

Hello, Designing a reliable power arrangement for a 100 kW fire pump requires precise engineering coordination between the Generac SD400 generator, 700A Siemens magnetic-trip breaker, dedicated transfer switch, and the 75-foot feeder run. My professional engineering background and multidisciplinary experience in CAD/CAM-based engineering solutions support accurate, practical, and buildable electrical documentation. I focus on precision, code compliance, and real-world construction feasibility, producing clear technical plans that contractors can use effectively. My electrical engineering and engineering skills, combined with experience developing coordinated permit-ready documentation, enable me to present the generator, breaker, transfer switch, feeder, and fire-pump power design in a clear, professional format. I am ready to provide a carefully coordinated design package for this fire-pump generator connection and would welcome the opportunity to deliver it. Thanks!
$555 USD in 4 days
0.0
0.0

Hello, no problem. As a licensed engineer, I can review and develop the generator power design for your 100 kW fire pump, including the Generac SD400 generator, 700 A field-adjustable Siemens magnetic-trip breaker, and dedicated transfer switch. I will evaluate the electrical load, starting requirements, available fault current, conductor sizing, voltage drop over the 75-foot run, overcurrent protection, grounding, and coordination with applicable fire-pump requirements. I can prepare a clear one-line diagram, equipment and conductor schedules, and supporting design calculations based on the verified equipment ratings and site conditions. Please share the generator and fire-pump nameplates or submittals, system voltage and phase, transfer-switch specifications, and project location so I can confirm the design criteria and applicable code requirements. Sincerely, John
$400 USD in 1 day
0.0
0.0

Hi, I am a licensed engineer with experience in electrical power system design, generator integration, and life-safety equipment. I can review the 100 kW fire pump load and Generac SD400 generator configuration, including the 700 A field-adjustable Siemens magnetic-trip breaker and the dedicated transfer switch. I will evaluate the 75-foot feeder route, conductor and grounding requirements, overcurrent protection, voltage drop, and applicable NEC/NFPA 20 and NFPA 110 requirements. I can prepare a coordinated power design with a one-line diagram, equipment connections, and supporting calculations, subject to verification of the equipment nameplates and applicable project requirements. Could you share the fire pump motor voltage, horsepower, phase, starting method, and the generator and transfer-switch specifications? Best regards, Justin
$500 USD in 1 day
0.0
0.0

⭐⭐⭐Hello, I can produce the fire pump power design package for this installation — a 100 kW fire pump served by the Generac SD400 through a dedicated transfer switch, with a 75' feeder and a 700 A Siemens breaker with field-adjustable magnetic trip. The work covers verifying generator sizing against the pump's locked-rotor starting kVA plus any simultaneous loads per NFPA 20, confirming the breaker's continuous rating and instantaneous trip setting allow the pump to start and run without tripping per NFPA 70 Article 695.4, and checking the 75' feeder for voltage drop and conductor ampacity at both starting and running conditions. I would deliver a one-line diagram, load and generator sizing calculations, breaker trip settings with justification, transfer switch and controller coordination, feeder and conduit schedule, and a compliance note referencing the applicable NFPA 20 and 695 clauses, plus a short memo flagging anything in the existing setup that needs correcting before installation. One point to settle up front: if the package must be sealed for permitting, the drawings need to be stamped by a licensed PE in the project's jurisdiction — if you hold that license, tell me and I will note it on the submittal, otherwise I will produce the engineering and calculations for your engineer of record to review and seal. Best Regards
$500 USD in 7 days
0.0
0.0

Hello, I’m an experienced engineer with expertise in electrical power systems and code-compliant design. I can review the 100 kW fire pump, Generac SD400 generator, 700A Siemens breaker, and dedicated transfer switch arrangement, including load calculations, cable sizing, and NEC/NFPA compliance. Please share the existing drawings and project location so we can discuss the scope, timeline, and cost. Thank you!
$500 USD in 3 days
0.0
0.0

My electronics background is the most relevant foundation I can offer for reviewing your fire pump generator power design. The project involves a 100 kW fire pump, a Generac SD400 generator, a 700 A magnetic-trip field-adjustable Siemens breaker, and a dedicated transfer switch over a 75-foot feeder—equipment and power-distribution details that require careful attention to electrical coordination and reliable operation. I am detail-oriented and focused on practical, dependable solutions. My broader technical experience in system design, automation, reliability, and cybersecurity also supports a disciplined approach to identifying configuration concerns and ensuring the proposed arrangement is clearly documented. I would be glad to apply my electronics expertise to this design and help you move it forward with confidence.
$300 USD in 4 days
0.0
0.0

Are you looking to design or troubleshoot a 100 kW fire pump power supply system? As I understand the setup: Fire Pump: 100 kW. Generator: Generac SD400. Circuit Breaker: 700 A Siemens magnetic-trip breaker with adjustable field settings. Cable Distance: 75 ft from generator to fire pump. Transfer Switch: Dedicated fire pump automatic transfer switch (ATS). What would you like me to prepare: a complete electrical design review, breaker and cable sizing, protection coordination, or a troubleshooting proposal?
$250 USD in 3 days
0.0
0.0

Boston, United States
Payment method verified
Member since Nov 3, 2026
₹37500-75000 INR
$250-750 USD
$10-20 SGD / hour
$30-250 USD
₹100-400 INR / hour
₹12500-37500 INR
$30-250 USD
₹1500-12500 INR
€12-18 EUR / hour
$30-250 USD
$250-750 USD
$25-50 AUD / hour
₹250000-500000 INR
$750-1500 USD
£20-250 GBP
$1500-3000 USD
₹1500-12500 INR
$750-1500 USD
$15-25 CAD / hour
₹12500-37500 INR