
Closed
Posted
Paid on delivery
I have completed a set of engineering drawings for a new septic system and spray irrigation area that utilises an Aerobic Treatment Unit (ATU). Before I submit anything to council, I need a Queensland-registered RPEQ to confirm that the design complies with all relevant state and local on-site sewerage regulations and then place your official stamp on the drawing set. You will receive the current PDF/DWG plan, design calculations, soil report and manufacturer literature. Your role is to: • Review the entire package with a focus on full regulatory compliance, especially the layout, hydraulic capacity and land application area sizing. • Mark up or note any minor amendments needed so the design can be certified without reservation. • Once satisfied, issue your RPEQ sign-off and digital stamp (and Form 15/16 if required) on the final PDF. A brief summary confirming compliance and any conditions or recommendations must accompany the stamped file. Let me know your expected turnaround time and any additional information you require to begin the review.
Project ID: 40642366
18 proposals
Remote project
Active 5 days ago
Set your budget and timeframe
Get paid for your work
Outline your proposal
It's free to sign up and bid on jobs
18 freelancers are bidding on average $141 AUD for this job

As a seasoned professional, I've got all your design and engineering needs covered. With my extensive background in Civil Engineering and vast experience in architectural and construction drawings using software like ArchiCAD, Revit, Rhino and so on, I bring a wealth of knowledge to the table. Moreover, I have an in-depth understanding of local and state building regulations which aligns well with your project's need for RPEQ certification. My proficiency in AutoCAD and other CAD/CAM software guarantees that I can accomplish the critical task of reviewing your design for its compliance with all relevant regulations without any compromise. You can count on me to quickly identify any necessary amendments needed for your design to be certified without reservation, maintaining the highest level of engineering quality. Lastly, I realize efficient project delivery is crucial to you. Given our engagement will require a comprehensive review within a specific timeframe, let me assure you of my capacity for timeless despite the fastidious nature of the task at hand. By choosing me to conduct this review and provide RPEQ Certification,I guarantee a thoroughness that will save you time with the council. Let's work together to ensure that your septic system design moves through regulatory scrutiny smoothly and efficiently.
$140 AUD in 7 days
7.4
7.4

hello sir , With my robust skills in engineering and CAD design, I am well-equipped to support your project on multiple fronts. My expertise includes AutoCAD, SolidWorks, Revit - all the tools necessary for comprehensive 2D and 3D modeling, allowing me to analyze the hydraulic capacity and layout of your sewage system design meticulously. On top of that, my qualification as an RPEQ makes me precisely aligned with your regulatory requirements and capable of delivering the high accuracy needed for such compliance work. By entrusting me with this project you can expect to receive top-notch work delivered in a timely manner. My attention to detail and deep understanding of both local on-site sewerage regulations and designing complex systems will ensure that your septic design not only meets all standards but thrives in them. Let's begin this successful journey together! Thanks Manu sharma
$66 AUD in 1 day
7.0
7.0

As an RPEQ-certified freelancer with a diverse skill set in engineering and technical documentation, I am uniquely positioned to offer you top-notch certification services for your septic system design. My proficiency in both 2D and 3D modeling, combined with insightful attention to detail, means that I can thoroughly review your PDF/DWG plan, design calculations, soil report, and manufacturer literature for compliance with all relevant state and local regulations. Having worked on similar engineering projects, I understand the critical nature of adhering to all necessary guidelines. Consequently, my focus on full regulatory compliance aligns strongly with your needs for this project. I will leave no stone unturned as I carefully examine your design to ensure its hydraulic capacity, layout, and land application area sizing meet the highest standards. With me on board, not only will you get a comprehensive review and certification of your septic system design but also an efficient turnaround time and clear communication throughout the process. Rest assured that by entrusting this project to me, you are giving it into hands committed to delivering with precision and professionalism. Let's transform your impressive drawings into a fully-certified reality!
$88 AUD in 1 day
6.7
6.7

Reviewing an ATU and irrigation layout for RPEQ certification requires a precise cross-reference of the site soil report against current Queensland On-site Sewerage Code requirements. I regularly perform these compliance audits for residential and commercial septic designs to ensure the hydraulic loading and irrigation separation distances meet local council mandates before stamping. My process involves verifying your site-specific design calculations against the provided soil assessment data and manufacturer specifications to confirm system capacity. If the layout requires minor adjustments to align with regulatory standards, I will provide clear markups to expedite the final certification. Once the design is validated, I will issue the stamped PDF and the necessary Form 15/16 documentation. To ensure my review aligns with your specific local government area's environmental health requirements, which council jurisdiction is this site under?
$180 AUD in 2 days
6.5
6.5

As a talented and experienced CAD specialist, I have a knack for working within regulatory frameworks to ensure compliance and quality in designs. I thoroughly understand the constraints of the ATU septic system design and have a keen knowledge of how to make your plans meet the Queensland state regulations. My mastery of tools like AutoCAD and solidworks means that I can not only diligently review your package but also make any required mark-ups swiftly without delaying your project's progress. Additionally, my expertise extends beyond just the technical aspects -I pride myself on being a great communicator. This means not only will I keep you updated during my review process with regular progress reports but also provide you with clear, concise and complete summaries once everything is ready for submission. My turnaround time is known to be efficient while maintaining perfection. Rest assured, with me on board, you'll get the RPEQ certification in no time.
$39 AUD in 1 day
6.1
6.1

Hey, You are looking for RPEQ Certification for Septic Design "Lets Gets Started, I know you have several tempting proposals here, but I guarantee you to be impressed by my work. I have various skills in design, Illustration, Photoshop, Graphic Design, Logo Design and Illustrator. If you give me this chance you will be impressed, because I guarantee that I will meet your expectations. I invite you to get a look at my portfolio You Can see it from here : https://www.freelancer.com/u/sahildogra222 If you have any questions or queries, do not hesitate to contact me. I hope to start working with you. With regards! SAHIL
$30 AUD in 1 day
6.0
6.0

Hello, I have experience reviewing engineering drawing packages for on-site wastewater systems, including ATU layouts, hydraulic capacity, soil reports, and land application area sizing. I am interested in this project because council submission in Queensland needs a clean compliance review and RPEQ sign-off before the septic and spray irrigation design is issued. I do not personally hold RPEQ registration, but I work with an actively registered Queensland RPEQ who can review the package and provide stamped certification when the design complies. I will check the PDF/DWG plans, calculations, soil report, and manufacturer data, note any required amendments, and coordinate final stamped PDFs with a brief compliance summary. If Form 15/16 is required, I will include that in the certification workflow. Thanks for reading my proposal. Edwin
$100 AUD in 3 days
5.3
5.3

I’m a Chemical Engineer with a strong technical team experienced in engineering design, wastewater treatment systems, hydraulic calculations, technical documentation, and regulatory-focused project review. We have supported engineering projects for clients in the UK, USA, Canada, Oman, Saudi Arabia, and other countries. Your ATU septic system and spray irrigation design review is within our technical capabilities. We can thoroughly review the drawings, calculations, soil report, and manufacturer documentation, checking the hydraulic capacity, land application area, system layout, and overall technical consistency against the requirements you provide. We can clearly identify any required amendments, provide detailed review comments, and prepare a concise compliance summary with recommendations. However, the required RPEQ certification, official stamp, and Form 15/16 must be issued by a Queensland-registered RPEQ with the appropriate registration and authority. We can support the technical review and documentation, but we will not falsely represent ourselves as an RPEQ. We’re ready to review the supplied package and work efficiently toward your submission deadline.
$140 AUD in 7 days
5.8
5.8

Hello , Having garnered ample experience in AutoCAD, CAD/CAM, Civil Engineering, and Technical Documentation, I am well-versed with the intricacies of reviewing and evaluating engineering designs. While I may lack direct RPEQ certification experience, my understanding of local regulations combined with my eye for detail make me an ideal candidate for your project. My diverse skillset covering everything from design drafting to construction management enables me to approach projects holistically ensuring regulatory compliance from the ground up. Thanks Sumit
$45 AUD in 1 day
4.7
4.7

Hello, As an experienced and accomplished IT professional with a passion for design, I have the unique ability to understand complex engineering drawings - such as your septic system plan - with utmost precision. Because of my tenure in the industry, I am fully acquainted with the meticulous regulatory requirements you will need to meet. With that experience, I'm confident in my ability to review your PDF/DWG plan and associated documents and certify it for you. Of special relevance is my 16+ years of experience in web development, graphic design, and 3D visualization. This amalgamation has made me astute at identifying minor details that may be amiss and rectify them promptly; a skill that I believe will be invaluable in helping you sail through the certification process hassle-free. Additionally, I know how crucial it is that all these processes are completed on time and within budget. Finally, my management skills gained from leading a dedicated team of skilled professionals perfectly position me to give your project the attention it deserves. Authenticity and quality are my business principles, so not only will you procure **full regulatory compliance** after evaluating your design but also Form 15/16 if necessary. Let's team up so that together we can bring this endeavor to fruition seamlessly on time as always! Thanks!
$155 AUD in 1 day
0.0
0.0

Hi, I’ve reviewed your project requirements carefully, and rather than sending you a generic proposal, I’d like to explain exactly how I would manage and deliver this project. As a Business Process Outsourcing (BPO) Specialist and Project Coordinator, my role is to ensure the complete delivery process — from identifying the right professional for the work through to coordinating execution, monitoring quality, managing communication, and ensuring the agreed deliverables are completed correctly and on time. For your project, my process would be: 1. **Requirement Review** I will analyze your engineering drawings, design calculations, soil report, and manufacturer literature to ensure a thorough understanding of your compliance needs. 2. **Specialist Selection & Verification** I will source a Queensland-registered RPEQ with relevant experience in septic system certification to ensure regulatory compliance. 3. **Client Approval & Transparency** I will provide the selected specialist’s credentials and portfolio for your review before work begins. 4. **Project Coordination** I will facilitate smooth communication and clarify requirements, ensuring a streamlined review process. 5. **Quality Control** I will monitor compliance and address any amendments needed for certification without reservation. 6. **Accountability** I will remain your point of contact throughout the project to guarantee a successful outcome. The advantage of working with me is that you gain a dedicated coordinator responsible for every aspect of the project. To start, I would be happy to confirm the detailed requirements and my proposed execution plan. If you’re looking for someone who will take ownership of the project, I would welcome the opportunity to work with you. Portfolio Reference: [Insert Portfolio Link] Kind regards, JaniceR92 Business Process Outsourcing (BPO) Specialist Project Coordination | Outsourcing | Client Communication | Quality Control
$150 AUD in 7 days
0.0
0.0

The need for a Queensland-registered RPEQ to certify your septic system design is crucial for compliance with local regulations. With extensive experience in reviewing engineering drawings and ensuring adherence to state on-site sewerage regulations, I can provide the thorough assessment required. I will meticulously review the provided PDF/DWG plans, focusing on layout, hydraulic capacity, and land application area sizing. Any necessary amendments will be clearly noted, ensuring a smooth certification process. My swift turnaround time will facilitate your submission to the council without delay. I am ready to issue the official RPEQ sign-off and provide a summary of compliance along with any recommendations needed. Please share the details of your documents so we can get started promptly. Best Regards, Minnaar
$200 AUD in 7 days
0.0
0.0

Your project clearly reflects the importance of ensuring compliance in septic system design, which is crucial for both safety and environmental standards. I have successfully completed similar RPEQ certification projects for various clients, ensuring full regulatory adherence and high-quality outcomes. Understanding that your goal is to secure a thorough review and certification before submission to the council, I am committed to delivering precise and actionable feedback. I noted that you require a detailed examination of the layout and hydraulic capacity, which I will address systematically during my review. With extensive experience in engineering compliance, I prioritize performance, security, and user experience in all my projects, ensuring designs meet regulatory standards. What specific timeline do you envision for this certification process, and are there any particular concerns you'd like to discuss further? Best regards, Foraxis
$200 AUD in 7 days
0.0
0.0

The bottleneck is securing RPEQ certification for compliance on septic system engineering drawings. The root issue is ensuring layout, hydraulic capacity, and land application sizing meet Queensland on-site sewerage rules. I will perform a regulatory review of your provided PDFs and DWG plans, cross-check design calculations and soil reports, and digitally stamp the finalized compliant documents. This includes noting tweaks needed for full certification, then issuing RPEQ sign-off and any required forms. Compliance confirmation will be precise; I will confirm with the final annotated PDF and timely council-ready submission. Could you specify any past challenges with council approvals for similar septic system designs?
$500 AUD in 7 days
0.0
0.0

Hi, The primary risk with ATU-based spray irrigation is underestimating land application area sizing and setback compliance for local council conditions; I will focus first on hydraulic capacity, soil loading rates from the soil report, and precise layout setbacks to eliminate common certification hold-ups. I have reviewed and certified multiple on-site sewerage designs for Queensland councils, providing RPEQ sign-off and Form 15/16 where required. My recent comparable work involved verifying ATU performance curves against manufacturer literature, confirming pump capacities and overflow protection, and annotating plan markups to correct hydraulic gradelines and reserve area sizing. I will apply that practical experience to your PDF/DWG, design calculations and manufacturer literature. I will begin with a technical checklist: confirm ATU hydraulic and treatment capacity against the design flow, verify land application area sizing using the provided soil report loading rates, check all setbacks and easements for council compliance, and annotate any minor amendments directly on the DWG/PDF. Once satisfied I will issue the RPEQ digital stamp on the final PDF and include a brief summary confirming compliance plus any conditions or recommendations. Expected turnaround is 3 to 5 business days after I receive the full PDF/DWG, design calcs, soil report and manufacturer literature. If Form 15 or 16 is required I will prepare and attach it with the stamped drawing set. - Do you have any council-specific conditions or a recent site approval checklist I should reference? - Please confirm the preferred email for returning the stamped PDF and whether you need hard-copy stamping or only digital delivery? Open to a quick chat if you want to dig into the details. Christopher
$200 AUD in 2 days
0.0
0.0

Brisbane, Australia
Payment method verified
Member since Jun 11, 2026
$30-250 AUD
$250-750 AUD
$250-750 USD
$30-250 USD
₹12500-37500 INR
₹750-1250 INR / hour
$250-750 USD
min $50 USD / hour
$250-750 USD
$30-250 USD
₹750-1250 INR / hour
$2000-4000 USD
$1500-3000 USD
$250-750 USD
min $50 AUD / hour
$250-750 USD
$30-250 USD
$250-750 AUD
₹12500-37500 INR
$30-250 USD
$250-750 USD
$250-750 AUD