I have a complete Bill of Quantities that now needs a sharp set of eyes to confirm every line item, cross-check the measurements, and generate a reliable material takeoff. Your task is to comb through the document, flag any inconsistencies or omissions, and recalculate quantities where necessary so I can lock the numbers in with confidence before procurement begins. You will receive the current BOQ in its native spreadsheet format and, if helpful, I can forward drawings and specifications once we get started. I need the review performed against standard construction measurement practice, with any assumptions or clarifications clearly explained. Deliverables • A clean, verified BOQ showing corrected quantities and comments on each change • A separate material estimation sheet ready for pricing • A brief summary report that highlights discrepancies found, risks, and recommendations Accuracy and clarity are key; please bring your professional experience in quantity surveying and cost control to bear so I can move straight to tendering once your review is complete.
Project ID: 40792548
22 proposals
Remote project
Active 1 day ago
Set your budget and timeframe
Get paid for your work
Outline your proposal
It's free to sign up and bid on jobs
22 freelancers are bidding on average ₹22,346 INR for this job

My civil engineering, structural engineering, and construction drawing background makes me well suited to audit your BOQ and validate quantities against the relevant design information. I work with AutoCAD and architectural documentation, enabling me to review measurements in the context of plans rather than treating the spreadsheet as isolated figures. I can carefully check line items for inconsistencies, omissions, and quantity errors; identify assumptions that affect the takeoff; and present corrections clearly in the BOQ. My experience across building architecture, structural work, and project management supports a practical review focused on procurement readiness, cost control, and clear documentation. I can also prepare a separate material estimation sheet and concise summary of discrepancies, risks, and recommendations. I am ready to apply my engineering and drafting expertise to give you a clear, dependable BOQ review before tendering.
₹25,000 INR in 2 days
7.5
7.5

With 10 years of structural engineering and quantity surveying experience conducting detailed material takeoffs, cost controls, and BOQ reconciliations across civil and building projects, I am ready to audit your Bill of Quantities, cross-referencing line items against your drawings, correcting discrepancies, and delivering a locked-in, procurement-ready takeoff. Please share your native BOQ spreadsheet, along with the project drawings and specification sheets, so we can begin the cross-check and verification immediately. Best regards, Ghullam Hussain, P.E.
₹25,000 INR in 5 days
7.6
7.6

My background as a qualified structural engineer and architect makes me well suited to auditing a BOQ where quantities must align with drawings, construction details, and practical building requirements. I can review each line item carefully, identify inconsistencies or omissions, and apply precise measurement judgment before your figures move to procurement and tendering. My Building Information Modeling expertise with Revit and ArchiCAD supports accurate quantity checking and coordination between architectural and structural information. I also work with AutoCAD and detailed 3D modeling, giving me a strong foundation for cross-checking dimensions, interpreting drawings, and preparing a clear material estimation sheet. Any revised quantities, assumptions, discrepancies, and risks can be presented in an organized format alongside the verified BOQ and summary report. I am ready to apply my structural, architectural, and BIM experience to give you a dependable quantity takeoff and a clearer basis for pricing.
₹12,500 INR in 1 day
6.7
6.7

A BOQ review should catch more than calculation errors—it should identify missing items, inconsistent units, duplicated quantities, and measurement assumptions that could create problems during tendering or procurement. I can review your existing spreadsheet line by line, cross-check quantities against the available drawings and specifications, and document every proposed correction with a clear explanation. I’ll also prepare a separate material takeoff and a concise summary of discrepancies, procurement risks, and outstanding clarifications. My workflow would be to: - Audit descriptions, units, formulas, rates where provided, and quantity extensions. - Recalculate measurable quantities against the supporting drawings and specifications. - Flag omissions, duplication, inconsistencies, and items requiring clarification. - Prepare a clean, corrected BOQ, a pricing-ready material estimation sheet, and a review summary. Please share the native BOQ spreadsheet first. If you have drawings, specifications, or the applicable measurement standard, those will help establish a reliable basis for verification. I’ll clearly distinguish confirmed corrections from assumptions that require your approval. Best regards, Sakshi
₹13,900 INR in 1 day
6.1
6.1

Hello, I’m Sandeep Kumar, an Architect & engineer with 18+ years of experience in construction documentation, quantity take-offs, BOQs, estimation, and cost coordination. I can thoroughly review your existing BOQ, cross-check item descriptions, units, measurements, calculations, and material quantities, and flag discrepancies, omissions, duplications, and potential cost risks. Where drawings and specifications are available, I’ll verify quantities against them and clearly document assumptions, corrections, and items requiring clarification. Deliverables: A reviewed BOQ with corrected quantities and comments, a separate material take-off and estimation sheet ready for pricing, and a concise report summarising discrepancies, risks, and recommendations. I work with Excel and AutoCAD, supporting traceable calculations and clearly organised, editable files suitable for tender preparation. Please share your native BOQ spreadsheet and available drawings/specifications so I can assess the scope and confirm the turnaround time. Best regards, Sandeep Kumar
₹37,500 INR in 7 days
6.3
6.3

Hello! I will thoroughly review your BOQ line by line, verify measurements against the drawings and specifications, and recalculate quantities using standard construction measurement practices. With professional experience in quantity surveying, material takeoffs, cost control, and tender documentation, I can identify omissions, duplication, incorrect units, and quantity discrepancies. You will receive a clean corrected BOQ with change comments, a separate pricing-ready material estimation sheet, and a concise discrepancy and risk report. All assumptions and clarifications will be clearly documented, giving you reliable quantities for confident procurement and tendering.
₹12,551 INR in 7 days
4.0
4.0

BOQ auditing and quantity takeoff are central to my experience, supported by over 20 years in civil engineering, including 16 years in the industrial sector. I prepare structural BOQs and cost estimates using Bluebeam, ESTA, and MS Office, with practical expertise in land surveying and earthwork area and volume calculations—directly relevant to verifying measurements and material quantities. My knowledge of CPWD Works Manuals, National Building Code, civil schedules of rates, specifications, analysis of rates, concrete technology, material engineering, and tender documentation enables me to identify omissions, inconsistent quantities, and measurement risks against accepted construction practice. My AutoCAD, structural engineering, and Revit experience also helps me cross-check quantities against drawings and coordinate structural, architectural, and MEP information where applicable. I can deliver a clearly corrected BOQ with change comments, a separate pricing-ready material estimation sheet, and a concise report covering discrepancies, assumptions, risks, and recommendations. I am ready to apply my quantity surveying and cost-control experience to give you dependable numbers for tendering.
₹25,000 INR in 7 days
3.7
3.7

I am having work experienxe ib Quantity Surveying works and BOQ Preparation. I will provide Audit BOQ and verifying Quanties and Materials Estimation for Pricing. I have Completed Similar works for UK Projects . I am also having ISO 9001:2015 Quality Management Services Lead Auditor.
₹35,000 INR in 7 days
2.5
2.5

Hello, I can review your BOQ thoroughly, verify measurements and quantities, identify discrepancies or missing items, and prepare an accurate material takeoff for procurement and tendering. I will check the existing spreadsheet against standard construction measurement practices and any drawings or specifications provided. You will receive a corrected BOQ with clear comments, a separate material estimation sheet ready for pricing, and a concise report highlighting discrepancies, risks, assumptions, and recommendations. I have a civil engineering background and experience in construction drawings, quantity calculations, and Excel-based estimation. I focus on accuracy, clear documentation, and practical results. Please share the BOQ to get started. I can also review supporting drawings wherever required to verify the quantities more reliably. Best regards,
₹12,500 INR in 1 day
1.6
1.6

Dear Client, I can perform a meticulous audit of your Bill of Quantities to ensure your numbers are locked in and ready for procurement and tendering. As a Civil Engineer and Contracting Manager, I review BOQs daily and know exactly where errors hide—from missing deductions for openings to overlapping measurements and formula errors. Based on your requirements, I will deliver exactly what you need: Verified BOQ: A clean spreadsheet with corrected quantities and a dedicated "Comments" column explaining every change I make. Material Estimation Sheet: A clean, separated takeoff ready for your team to price. Summary Report: A concise document highlighting the discrepancies, project risks, and my recommendations based on standard measurement practices. Please share the native spreadsheet and the drawings/specifications. I cross-reference against drawings to ensure nothing is missed. I can deliver the complete audit and reports within 2 days for a fixed price of ₹12,500 INR, allowing you to move straight to tendering without delay. I am ready to start immediately. Let's get your numbers perfect. Best regards, Haseebullah Sharifi
₹12,500 INR in 2 days
0.8
0.8

I have a complete Bill of Quantities that now needs a sharp set of eyes to confirm every line item, cross-check the measurements, and generate a reliable material takeoff. Your task is to comb through the document, flag any inconsistencies or omissions, and recalculate quantities where necessary so I can lock the numbers in with confidence before procurement begins. You will receive the current BOQ in its native spreadsheet format and, if helpful, I can forward drawings and specifications once we get started. I need the review performed against standard construction measurement practice, with any assumptions or clarifications clearly explained. Deliverables • A clean, verified BOQ showing corrected quantities and comments on each change • A separate material estimation sheet ready for pricing • A brief summary report that highlights discrepancies found, risks, and recommendations Accuracy and clarity are key; please bring your professional experience in quantity surveying and cost control to bear so I can move straight to tendering once your review is complete.
₹12,500 INR in 1 day
0.0
0.0

Our structural engineering experience gives your BOQ audit the technical perspective needed to verify quantities against construction requirements, not simply review spreadsheet totals. Through Buildwithengineers Private Limited, I work with an experienced team focused on accurate engineering deliverables and dependable cost-control support. I can review the native BOQ for measurement inconsistencies, missing items and quantity discrepancies, while clearly documenting assumptions and revisions. My structural engineering background is relevant to checking construction-related quantities and identifying issues that could affect procurement or tender pricing. I will provide the corrected BOQ with comments, a separate material estimation sheet, and a concise summary of discrepancies, risks and recommendations. I am ready to bring a careful, engineering-led review to your BOQ so you can proceed toward tendering with greater confidence.
₹30,000 INR in 10 days
0.0
0.0

Hi, I've read your brief for the BOQ audit and material takeoff. I run SiteSetu, a construction app and quantity surveying team, and we've delivered about 100 BOQ projects in the last few months (residential, commercial, hospital and high-rise). I'm a civil engineer from IIT Bombay with 15 years in construction, and I manage the team on every project. New to Freelancer, not new to the job. How we'll do it: 1. Check every line of your BOQ against the drawings and specifications, to IS 1200 / standard measurement practice: units, quantities, missing items, double counts and description mismatches. 2. Recalculate every doubtful line with a measurement sheet behind it (dimensions, deductions, net quantity), so you can verify each change. 3. Deliver: a) the verified BOQ with corrected quantities and a comment on every change; b) a separate material estimation sheet ready for pricing (cement, steel by diameter, sand, aggregate, bricks/blocks, tiles, with wastage); c) a short summary report of discrepancies, risks and recommendations before you go to tender. Timeline: 3 working days from receiving the BOQ and drawings. Fixed price: INR 15,000. I can share samples of my past work if required.
₹15,000 INR in 3 days
0.0
0.0

Hello, I'm a civil engineer and the planning lead on a high-rise tower and a township project in Gujarat, so BOQs and quantities are part of my regular work. For your BOQ I will: • Check every line: units, quantity × rate, sub-totals, and missing or duplicated items • Recalculate quantities from your drawings to IS 1200 (or the method you follow), with every assumption noted • Deliver the corrected BOQ with a comment on each change, a separate material sheet ready for pricing, and a one-page summary of discrepancies, risks and recommendations Roughly how many line items are there, and are the drawings in PDF or DWG? I'll start as soon as the milestone is created. Kundan
₹15,000 INR in 5 days
0.0
0.0

We recently finalized a similar quantity takeoff project and can ensure your BOQ is meticulously reviewed and delivered promptly. I understand the importance of accuracy and clarity in confirming every line item, especially when it comes to recalculating quantities. With extensive experience in quantity surveying and cost control, I will thoroughly examine the provided spreadsheet, flagging inconsistencies and clarifying any assumptions. My approach adheres to standard construction measurement practices, ensuring you receive a reliable material takeoff and a well-documented summary report outlining discrepancies and recommendations. I would like to discuss your project in further detail. Best Regards, AlexanderWC
₹28,150 INR in 7 days
0.0
0.0

Hello, I'm a Civil Engineer and Project Manager experienced in Quantity Surveying, BOQ verification, material takeoffs, and cost control. I can carefully review your BOQ, identify discrepancies, verify quantities against drawings, and provide a corrected BOQ, material estimation sheet, and summary report. I prioritize accuracy, transparency, and professional documentation. Best regards, Eng. Laith Waleed I will apply my Civil Engineering and Quantity Surveying experience to review every BOQ line item, cross-check quantities against the available drawings and specifications, and identify omissions, inconsistencies, and calculation errors before procurement. My background in construction management, estimation, technical documentation, and project monitoring enables me to produce clearly organized deliverables: a verified BOQ with comments on revisions, a separate material takeoff sheet suitable for pricing, and a concise report covering discrepancies, assumptions, risks, and recommendations. I work systematically and place strong emphasis on accuracy, traceability, and practical construction measurement standards. Please choose me to give your BOQ the detailed professional review needed for confident tendering and procurement.
₹25,000 INR in 7 days
0.0
0.0

I have read your brief: you need every line of the existing BOQ checked against the drawings, corrected quantities, a separate material takeoff ready for pricing, and a short report of discrepancies and risks before tender. I am a Quantity Surveyor with 20+ years in building, infrastructure and oil & gas projects. I will re-measure each item to standard measurement rules, mark every change with a comment in the BOQ, list omissions and duplicated items, and give you: - Corrected BOQ (Excel) with change notes per line - Material estimation sheet ready for pricing - Summary report: discrepancies, risks and recommendations (PDF) Please share the BOQ spreadsheet and, when ready, the drawings and specifications. Regards, Engr. Zahid Karim
₹16,000 INR in 5 days
0.0
0.0

Hello, I am a Civil Engineer & Quantity Surveyor with 15+ years of experience, specializing in civil quantity take-off, BOQ preparation, verification, and cost estimation for villas, residential buildings, apartments, and other building projects. I can thoroughly review your existing BOQ against the available drawings, specifications. My scope will include: • Checking each BOQ line item and measurement • Recalculating quantities and identifying discrepancies • Identifying missing, duplicated, or incorrectly measured items • Cross-checking BOQ quantities against drawings • Preparing a corrected and clearly commented BOQ • Preparing a separate material take-off suitable for pricing/procurement • Highlighting assumptions, exclusions, risks, and items requiring clarification • Providing a concise summary of all major discrepancies and recommendations • Providing markup drawings & swift file from the Planswift I am proficient in Planswift, AutoCAD, and Excel for detailed quantity take-off and BOQ verification. I can initially review the BOQ and then cross-check it against the relevant drawings and specifications to ensure the final quantities are reliable before tendering/procurement. My expertise is in civil works only; MEP works are excluded unless specifically agreed. I would be happy to review the BOQ and discuss the scope, drawings, specifications, required format, and deadline before commencing. Regards, Shahul Hameed Badusha Civil Engineer / Quantity Surveyor
₹48,000 INR in 10 days
0.0
0.0

Dear Project & Procurement Team (Ludhiana), Unlike 1-day bots copying your brief word-for-word, we read your exact scope: you need an independent, pre-tender audit of your native spreadsheet BOQ, cross-checked against drawings/specs, plus a pricing-ready Material Takeoff (MTO) and Risk Report. Combining Mechatronics CAD/QS engineering + CFO cost-control & our ISO-9001 Construction Materials Desk, we deliver all 3 deliverables in 4 days (IS 1200 / CPWD DSR / RICS NRM2 compliant): 1. Verified Redline BOQ (Native Excel): 100% formula audit, drawing-to-BOQ dimension check, IS 1200 opening/deduction rules, and cell-by-cell change comments. 2. Separate Material Estimation (MTO) Sheet: Net vs. gross quantities using standard conversion factors (1.54 RCC, 1.33 mortar, d^2/162.2 rebar BBS) + wastage caps ready for vendor pricing, plus optional Vietnam ISO-9001 direct-mill FOB benchmarks (0% AIFTA Form AI, -18% to -32% cost savings). 3. Discrepancy, Risk & Tender Report: Flags missing items (formwork, waterproofing turn-ups, MEP sleeves) to block contractor variation claims. - Ho Hoang Duy My structural engineering and risk-assessment skills support a careful BOQ review, quantity cross-check, and material estimation focused on procurement accuracy. I can audit spreadsheet formulas, flag omissions and inconsistencies, document assumptions, and present clear comments with a concise risk summary. I’m ready to deliver a dependable, pricing-ready review.
₹23,500 INR in 4 days
0.0
0.0

Hi, I've 20 years in construction (sheet metal fabrication and site installation) and prepare takeoffs and BOQs regularly. I'll go through your BOQ line by line, re-measure against the drawings, and give you: a corrected BOQ with a comment on every change, a separate material takeoff sheet, and a short list of assumptions and omissions found. I use software tools for the measuring and check every quantity myself. Send the BOQ and drawings and I'll confirm turnaround. – Kenneth
₹22,000 INR in 4 days
0.0
0.0

Ludhiana, India
Member since Jul 26, 2018
$10-30 USD
₹600-1500 INR
€8-30 EUR
€8-300 EUR
$15-25 USD / hour
€30-250 EUR
€250-750 EUR
$25-50 CAD / hour
$25-50 USD / hour
min $50 USD / hour
₹600-1500 INR
$250-750 AUD
$250-750 USD
₹600-1500 INR
$100 USD
£250-750 GBP
£250-750 GBP
$250-750 USD
₹12500-37500 INR
£250-750 GBP