
Suljettu
Julkaistu
Maksettu toimituksen yhteydessä
I need two clean, planning-ready site layout drawings for a 605 kW ground-mounted solar farm in the UK. The local authority (Aberdeenshire) only requires a basic outline at this stage, so the focus is on clear presentation rather than exhaustive detail. These are two alternative site optionsand should be presented clearly as Option A and Option B. Scope of work (for BOTH options): * Site boundary shown (I will provide maps) * Solar panel layout (rows and spacing – standard UK assumptions) * Indication of inverter / transformer location * Access track (simple indicative route) * Perimeter fencing outline * North arrow and scale bar * Clean, professional layout suitable for planning submission Important: * Planning layout only (NOT engineering design) * No electrical diagrams required * No US-style permit drawings * Keep drawings simple and clear Assumptions: * Panels: ~600–650W modules * Target capacity: ~605 kW per option * Standard UK spacing **Deliverables:** * Option A: PDF + DWG * Option B: PDF + DWG Inputs I will provide: * Two site maps / screenshots (Option A and Option B) * Boundaries and access points
Projektin tunnus (ID): 40349533
12 ehdotukset
Etäprojekti
Aktiivinen 2 päivää sitten
Aseta budjettisi ja aikataulu
Saa maksu työstäsi
Kuvaile ehdotustasi
Rekisteröinti ja töihin tarjoaminen on ilmaista
12 freelancerit tarjoavat keskimäärin $223 AUD tätä projektia

Hi! As an electrical designer with experience in PVsyst and AutoCAD, I can create your requested layouts. I guarantee precise calculation of the number of modules, respecting the standard pitch and optimal positioning of inverters and enclosures. I will provide clean, professional DWG and PDF files. In addition to layouts, I am available for technical consultations or preliminary performance studies should the project progress. I look forward to hearing from you. Thank you.
$200 AUD 7 päivässä
4,6
4,6

Hi there, I noticed you need two clean planning ready site layout drawings for a 605 kW ground mounted solar farm in the UK, presented as Option A and Option B, including site boundary, solar panel layout with rows and standard UK spacing, inverter and transformer location, access track, perimeter fencing, north arrow, and scale bar, delivered as PDF and DWG for each option. I have extensive experience preparing planning stage solar farm layouts for UK local authorities, including recent work for a 500 kW site in Scotland where I produced clear, simple drawings that met council requirements without over engineering. I can take your site maps and create both options with professional presentation, using standard assumptions for panel spacing and access routes. Please share your two site maps and boundary details so I can start the layouts. Best regards Mobasher Reza
$240 AUD 3 päivässä
0,0
0,0

Nedlands, Australia
Maksutapa vahvistettu
Liittynyt helmik. 8, 2016
$30-250 AUD
$15-25 AUD/ tunnissa
$30-250 AUD
$30-250 AUD
$30-250 AUD
€250-750 EUR
$30-250 USD
₹12500-37500 INR
$250-750 USD
$15-25 CAD/ tunnissa
$3000-5000 USD
₹1500-12500 INR
₹750-1250 INR/ tunnissa
₹1500-12500 INR
$20000-50000 USD
₹400-750 INR/ tunnissa
$250-750 CAD
$10-30 USD
₹12500-37500 INR
$25-50 USD/ tunnissa
£250-750 GBP
$30-250 USD
$30-250 CAD
$250-750 AUD
$30-250 USD