Vba excel import msproject jobs

Suodata

Viimeisimmät hakuni
Suodatusperuste:
Budjetti
asti
asti
asti
Taidot
Kielet
    Työn tila
    9,478 vba excel import msproject työtä löytyi, hinnoittelu EUR

    Excel Add-In that retrieves and uploads table-data from and to Azure SQL database . Add-In also modifies the Excel sheets and controls user interaction. For mosts of the sheet mofdification there is available VBA script that need to be traslated to C#-code. Initial Visual Studio 2015 Project code is available and the Project needs to be done using

    €17 / hr (Avg Bid)
    €17 / hr Keskimäär. tarjous
    5 tarjoukset

    Excel Add-In that retrieves and uploads table-data from and to Azure SQL database . Add-In also modifies andthe Excel sheets and controls user interaction. For mosts of the sheet mofdification there is available VBA script that need to be traslated to C#-code. Initial Visual Studio 2015 Project code is avaiable and the Project needs to be done using

    €16 / hr (Avg Bid)
    €16 / hr Keskimäär. tarjous
    4 tarjoukset

    We have a few medium to complex excel macro (depending on your level of Excel Expertise) that needs to be created or modified based on our existing macro. Background: We have two worksheets in a given workbook file. We need to have various "column transpose" and lookups from sheet2 to sheet1. This is an ongoing progject meaning, if we need to add

    €124 (Avg Bid)
    €124 Keskimäär. tarjous
    28 tarjoukset
    Auto unzip file in VBA 6 päivää left

    I have a program that opens / closes 100s of files searching for key information. The pro... The problem is that they are 'gz' files zipped so i have to manually transfer all the files in my R: (zipped files) to my C: (unzipped), i would like someone to look at my VBA to see if there is a way to incorporate in a unzip function as it is opening a file.

    €96 (Avg Bid)
    €96 Keskimäär. tarjous
    13 tarjoukset
    VBA expert needed 6 päivää left
    VARMENNETTU

    Need a VBA expert for create form and report

    €6 / hr (Avg Bid)
    €6 / hr Keskimäär. tarjous
    15 tarjoukset
    Project for Shikha M. 9 päivää left

    A complex VBA based project (similar to FIFO but has lots of complexities). This project needs be started right now and have a tight deadline. If interested please let me know, we can discuss the project in detail. Thanks !

    €100 (Avg Bid)
    €100 Keskimäär. tarjous
    1 tarjoukset

    Hi all Effectively, I am looking for a piece of VBA and/or python code attached to a spreadsheet that will automatically extract data from websites (3-5) so that when copied into excel they are in a consistent and comparable format. Advance excel VBA skills are required. Further information (format, websites) will be provided after,.

    €92 (Avg Bid)
    €92 Keskimäär. tarjous
    17 tarjoukset

    ...through the powerpoint when using section navigation through slides. Need sample code for powerpoint which hooks into navigation from slide to slide to be able to add logging vba code: - handling of slide names tages for logging - hooking into enter slide, leave slide, ... steps Details best clarified via chat. Will add additional information based on

    €36 (Avg Bid)
    €36 Keskimäär. tarjous
    2 tarjoukset

    ...through the powerpoint when using section navigation through slides. Need sample code for powerpoint which hooks into navigation from slide to slide to be able to add logging vba code: - handling of slide names tages for logging - hooking into enter slide, leave slide, ... steps Details best clarified via chat. Will add additional information based on

    €42 (Avg Bid)
    €42 Keskimäär. tarjous
    3 tarjoukset

    I need an Excel VBA Tool that can extract airfare and other flight information from Google Flights. The tool should run using an interface (mask) that lets me choose the following: - Departure Airport (code) - Destination Airports (codes separated by a comma) - Departure Date - Return Date - Class of flight (multiple selection must be available for

    €28 (Avg Bid)
    €28 Keskimäär. tarjous
    8 tarjoukset

    Following points in this macro are running well except points no. 5. & 9. Very small project. 1. Search tool to be placed in a folder along with multiple data excel workbooks. - DONE. 2. Tool should look for a keyword in all the existing workbooks in the folder only and copy paste the entire row in the search tool. - DONE 3. It should paste the workbook

    €8 (Avg Bid)
    €8 Keskimäär. tarjous
    4 tarjoukset

    ...through the powerpoint when using section navigation through slides. Need sample code for powerpoint which hooks into navigation from slide to slide to be able to add logging vba code: - handling of slide names tages for logging - hooking into enter slide, leave slide, ... steps Details best clarified via chat. Will add additional information based on

    €166 (Avg Bid)
    €166 Keskimäär. tarjous
    14 tarjoukset
    Excel vba code small issue 5 päivää left
    VARMENNETTU

    I get data from an api. 99% of data is appearing only 1% is missing. the code had been working perfectly since a year. This error happened today. May be i deleted something? please check whats the issue and fix it. "Team Viewer" is important, I won't send the code file.

    €17 (Avg Bid)
    €17 Keskimäär. tarjous
    7 tarjoukset
    Trello Power Ups Expert 5 päivää left
    VARMENNETTU

    ...Freelancers! We have an excel workbook which contains three sheets connect to each other using VBA. There are lists and buttons in the sheet which do have some associate functionality and ultimately reflects the changes in data tables. We would like to implement the same using trello power-ups API so that our users don't need to access the excel file. While bidding

    €92 (Avg Bid)
    €92 Keskimäär. tarjous
    2 tarjoukset

    Very simple requirements: 1) create excel vba code that will open a text file (e.g. [kirjaudu nähdäksesi URL:n]) 2) code will then do the following: 3) look for person's name in the line (e.g. Dr. FirstName Last Name) 4) remove the firstname and leave only Dr. LastName) 5) save text file without any further edits [kirjaudu nähdäksesi URL:n] - SHOWS YOU THE I...

    €22 (Avg Bid)
    €22 Keskimäär. tarjous
    11 tarjoukset
    Vba work in Microsoft access(Form) 5 päivää left
    VARMENNETTU

    Hello, looking for someone who can do form in access almost done with that just need to add some more work in it.

    €19 (Avg Bid)
    €19 Keskimäär. tarjous
    23 tarjoukset

    Can anyone write a script to automate data update/upload to ms project from ms excel. I have standard forms and need to update the project data through outlook inbox or by any other means.

    €121 (Avg Bid)
    €121 Keskimäär. tarjous
    19 tarjoukset

    ...help. I need to import data (mainly order book and prices) from a crypto exchange ([kirjaudu nähdäksesi URL:n]). All documentations are available on [kirjaudu nähdäksesi URL:n] (Quoine and Qryptos are same). Very simple task. The website provides full API commands details and Secret Key for authentication. You just need to import data into excel and m...

    €58 (Avg Bid)
    €58 Keskimäär. tarjous
    1 tarjoukset

    I’ll try to explain this the best I can. I want to setup 3 loops to pull data for college basketball games. I'm experienced in VBA but I'm having trouble creating a loop that does not error out after 15 games or so. There is some kind of security on the ncaa's site that prevents this type of data scraping I'm told. The workaround which has been mostly

    €410 (Avg Bid)
    €410 Keskimäär. tarjous
    19 tarjoukset

    Olá, Trabalho com varejo e atacado, venda de roupa feminina. Estou precisando de uma planilha em excel VBA, para otimizar meus processos de vendas e demonstrativos. Vi na internet muitas planilhas muito semelhantes a que eu preciso, precisando somente de algumas pequenas alterações, mas infelizmente quem as vende não faz alterações. a segu...

    €170 (Avg Bid)
    €170 Keskimäär. tarjous
    4 tarjoukset

    I need an excel vba expert to write a two phase code for me, with the first phase being to import data from two different workbooks based on a userform where a certain value is entered, and the second phase to import data from another workbook based on certain letters that are entered for the value talked about in the first phase

    €31 (Avg Bid)
    €31 Keskimäär. tarjous
    24 tarjoukset

    I am having a hard time creating a macro to ‘call’ a SharePoint. I am needing a VBA Excel macro code to ‘call’ a SharePoint so I can chose a file within the SP and have it automatically populate to a tab within the Excel spreadsheet.

    €128 (Avg Bid)
    €128 Keskimäär. tarjous
    19 tarjoukset
    Excel and VBA code 4 päivää left

    I need someone who is confident in writing efficient code and is willing to work for 2-3 days. Potential for constant work.

    €239 (Avg Bid)
    €239 Keskimäär. tarjous
    59 tarjoukset
    Excel VBA One Datasheet 4 päivää left
    VARMENNETTU

    Hi, I receive constantly a data sheet that is always in the same format. The problem is that it is not a proper table and I need to amend it man...receive constantly a data sheet that is always in the same format. The problem is that it is not a proper table and I need to amend it manually. I would like to have a little VBA code that does it for me.

    €25 (Avg Bid)
    €25 Keskimäär. tarjous
    33 tarjoukset

    Requirement to create an excel configurator

    €20 / hr (Avg Bid)
    €20 / hr Keskimäär. tarjous
    42 tarjoukset
    vba macro expert 3 päivää left
    VARMENNETTU

    i have some work within vba macro expert with script .if you think you can do it ,bid it The rest of the words will be called Inbox, and the project details .my budget is low thank you

    €17 (Avg Bid)
    €17 Keskimäär. tarjous
    8 tarjoukset
    VBA to automate Ppt 3 päivää left

    Hi, I am looking for a person who know how to make automatically ppt to vba

    €19 (Avg Bid)
    €19 Keskimäär. tarjous
    12 tarjoukset
    Linking Google Sheet with SW API 3 päivää left
    VARMENNETTU

    I would like to add data into Google Sheet from Solidworks. I'm using SolidWorks to make techn...data to Google Sheet and store files in Google Drive. I would like to have work done in two steps: 1. Populate new row in Google Sheet with data sent from Solidworks Macro (VBA, C#) 2. Save files to Google Drive and make link to the files in Google Sheet

    €157 (Avg Bid)
    €157 Keskimäär. tarjous
    6 tarjoukset

    I need some VBA code written to grab the FILL COLOR of a specific cell and then add all of the values that meet that FILL COLOR.

    €21 (Avg Bid)
    €21 Keskimäär. tarjous
    6 tarjoukset
    Scrape a website using Excel VBA only 3 päivää left
    VARMENNETTU

    The site is: https://pubchem.ncbi.nlm.nih.gov/compound/Triasulfuron#section=Top Input will be a list of chemicals. You need to search for that chemical and extract the data in the attached format. Note that the download tab contains a list of files that need to be downloaded for each chemical. Out of this only the patents file needs to be downloaded for each compound. Please bid only after you ...

    €14 (Avg Bid)
    €14 Keskimäär. tarjous
    14 tarjoukset

    i have some work within vba macro expert with script .if you think you can do it ,bid it The rest of the words will be called Inbox, and the project details . thank you

    €17 (Avg Bid)
    €17 Keskimäär. tarjous
    4 tarjoukset
    Revise VBA Code 1 päivä left

    I need to loop through each row and for any cells that meet the "if" condition, then the cell value 6 columns to the left is displayed....to the left is displayed. I already have the entire code written that can email me the cell values, just needs small modification. Should only take 5 minutes for experienced VBA programmer. Need this done in 1 hour.

    €21 (Avg Bid)
    €21 Keskimäär. tarjous
    18 tarjoukset

    We are searching for a experienced developer who has knowledge in both MS Access VBA and one other language such as Python/Rails/PHP. The goal of this process is to achieve the same functionality as before. Please don´t write a long list of accomplishments in your application but rather give me a short explanation how you would handle that problemset

    €52 (Avg Bid)
    €52 Keskimäär. tarjous
    5 tarjoukset
    Macro excel vba 1 päivä left
    VARMENNETTU

    download the data from sap and automate the report and share to all recipient.

    €17 (Avg Bid)
    €17 Keskimäär. tarjous
    25 tarjoukset

    I have a input excel file which i need to split into multiple excel files that i need. See attachment and video for more detail

    €17 (Avg Bid)
    €17 Keskimäär. tarjous
    14 tarjoukset
    €28 Keskimäär. tarjous
    8 tarjoukset

    We are searching for a experienced developer who has knowledge in both MS Access VBA and one other language such as Python/Rails/PHP. The goal of this process is to achieve the same functionality as before. Please don´t write a long list of accomplishments in your application but rather give me a short explanation how you would handle that problemset

    €166 (Avg Bid)
    €166 Keskimäär. tarjous
    18 tarjoukset

    The site is: https://pubchem.ncbi.nlm.nih.gov/compound/Triasulfuron#section=Top Input will be a list of chemicals. You need to search for that chemical and extract the data in the attached format. Note that the download tab contains a list of files that need to be downloaded for each chemical Please bid only after you have gone through the attachment

    €29 (Avg Bid)
    €29 Keskimäär. tarjous
    6 tarjoukset

    ...workaround so please read carefully...I am budgeting for one day's worth of effort. We will need screenshare. I will need for you to give me the VBA script based upon the review of the website. I will enter into excel and get the [kirjaudu nähdäksesi URL:n] I'm on VPN this is the only way. I have to accomplish as if I was running my own scipt. Because this is a...

    €119 (Avg Bid)
    €119 Keskimäär. tarjous
    25 tarjoukset

    Hello, I would like to build a tool in excel that will allow me to color code different point series on a graph depending on a category I select.

    €94 (Avg Bid)
    €94 Keskimäär. tarjous
    25 tarjoukset

    I have 4 excel macros running on windows 7 that need to be rebuilt so they will run correctly on windows 10 system. Issues to be resolved: 1) auto run the Excel tasks every 3 hrs (using Windows Task Scheduler - or other app(?) if Task Scheduler is not stable) 2) avoid memory leaks 3) ensure that data imported from source CSV's is fully loaded before

    €152 (Avg Bid)
    €152 Keskimäär. tarjous
    25 tarjoukset

    I have a VBA Macro for scraping data off of a website. The issue is that it comes with duplicates in the excel sheet. I have tried to adjust wait time but this is on and off - works/doesn't work. Need a permanent solution for this so that the VBA just gets the data without duplicates. State your approach to this task and I will hire you.

    €28 (Avg Bid)
    €28 Keskimäär. tarjous
    15 tarjoukset

    Hi, I would like to sort some files according to age, size, length and weight, etc. The drop down functions should indicated ranges which i will provide. Also after completion, i should know how to add and delete those ranges. It should be a fairly simple project.

    €21 (Avg Bid)
    €21 Keskimäär. tarjous
    50 tarjoukset

    ...following files: - Current stock (CSV) -Sales of the last 14 days (CSV) -Article Database (EXCEL) The first two CSV files I read about the query function in Excel. I then made a little "program", if you want to call it that, tinkered. I also worked a bit with VBA. However, the tool is very limited. The queried files must always have the same file path

    €68 (Avg Bid)
    €68 Keskimäär. tarjous
    18 tarjoukset

    I have a VBA Macro for scraping data off of a website. The issue is that it comes with duplicates in the excel sheet. I have tried to adjust wait time but this is on and off - works/doesn't work. Need a permanent solution for this so that the VBA just gets the data without duplicates.

    €23 (Avg Bid)
    €23 Keskimäär. tarjous
    26 tarjoukset

    Seeking skilled Excel/VBA developers to create complex tax workpapers. Financial modeling expertise a plus. These are very sophisticated models with dozens of tabs and thousands of rows per tab

    €47 / hr (Avg Bid)
    €47 / hr Keskimäär. tarjous
    41 tarjoukset

    I need a VBA or Java script in ms access or and callable js module that w3ill 1. Open a webpage 1.1 if login needed login with our credentials 2. verify navigation to the page 3. find "next page" button 4. click button 5. fill in all appropriate fields (as define by database fields (we supply) 6. find "next" button (id, text we supply) and click

    €376 (Avg Bid)
    €376 Keskimäär. tarjous
    26 tarjoukset

    We will provide a set of input files in a folder. Each of the input files need to be read from the folder and based on logic, needs to be converted into another format (excel sheets)

    €76 (Avg Bid)
    €76 Keskimäär. tarjous
    40 tarjoukset

    ... - We want the project owners to input their update into SharePoint and pull that into this workbook, mapping to the data elements in the dashboard - We want to leverage a VBA button to produce a PowerPoint slide of the dashboard to automate our deck production. We hope you will accept our offer and look forward to hearing from you soon. Please let

    €457 (Avg Bid)
    €457 Keskimäär. tarjous
    10 tarjoukset