Olympic cost over-runs infographic

  • Tila: Closed
  • Palkinto: $75
  • Vastaanotetut työt: 8
  • Voittaja: richardwct

Kilpailun tehtävänanto

I need an infographic about the potential 2026 Calgary Olympic winter games bid. I'd like to use some stylized cartoon-ish graphics of Calgary, Canada landmarks in the background and/or olympic sport cartoon-ish graphics and then show the cost overruns from the last 10 winter olympics as detailed on table 3 in this report: [login to view URL]

Maybe a bar chart or some other visualization of the cost overruns.

And maybe stick Calgary in there with a question mark next to it.

Size of the graphic should be 5" x 6.7" and high dpi suitable for print.

Suositellut taidot

Työnantajan palaute

“Really nice work and fixed issues quickly. ”

Profiilikuva TaxpayerDOTcom, Canada.

Kilpailun parhaat työt

Näytä lisää töitä

Julkinen selvennystaulu

  • symtanriverdi
    symtanriverdi
    • 9 kuukautta sitten

    working on it

    • 9 kuukautta sitten

Kuinka päästä alkuun kilpailuiden kanssa

  • Ilmoita kilpailusi

    Ilmoita kilpailusi Nopeaa ja helppoa

  • Saat valtavasti töitä

    Vastaanota tonnikaupalla osallistumisia Ympäri maailmaa

  • Myönnä palkinto parhaalle työlle

    Myönnä palkinto parhaalle työlle Lataa tiedostot - Helppoa!

Ilmoita kilpailu nyt tai liity tänään!