Fires in a pot

  • Tila: Closed
  • Palkinto: $90
  • Vastaanotetut työt: 6
  • Voittaja: kaihin

Kilpailun tehtävänanto

I am planning on opening fries specialty shop, which will serve in cinema food court, so I would like the following requirements are needed:

- Layout of the space
- List of machines/equipment like deep fryer, fridge, freezer etc.
- Electrical load schedule

I will attache the proposed location of the shop – 40 sqm – (green space)

Suositellut taidot

Työnantajan palaute

“He very nice person to work with :) ”

Profiilikuva abdullabinfaleh, Qatar.

Julkinen selvennystaulu

  • harshpkp
    harshpkp
    • 9 vuotta sitten

    where is the electrical design?

    • 9 vuotta sitten
  • harshpkp
    harshpkp
    • 9 vuotta sitten

    Electrical design?

    • 9 vuotta sitten
  • tsalamon
    tsalamon
    • 9 vuotta sitten

    Do you have any idea on the number of customers to be served at normal and peak capacities, so the right amount of counter space can be provided. Also how many different type of foods are you looking to serve ? French fries, doughnuts, etc. as different food types will require different equipment

    • 9 vuotta sitten
    1. abdullabinfaleh
      Kilpailun järjestäjä
      • 9 vuotta sitten

      Hello, one cashier will be fine and only one type of food will be severed which is french fries with many different toppings. some of the toppings is chicken and meat

      • 9 vuotta sitten
  • tsalamon
    tsalamon
    • 9 vuotta sitten

    Hello,

    • 9 vuotta sitten
  • harshpkp
    harshpkp
    • 9 vuotta sitten

    Length, width of the room?

    • 9 vuotta sitten
    1. leshaqtr
      leshaqtr
      • 9 vuotta sitten

      I dont have those information, just do it based on your assumptions

      • 9 vuotta sitten
  • harshpkp
    harshpkp
    • 9 vuotta sitten

    Basic details are missing. Like do you have 3 phase power supply available or single phase? Where are the racks? shelves etc?

    • 9 vuotta sitten
  • gabijames0507
    gabijames0507
    • 9 vuotta sitten

    Hi there, if possible could you provide the entry point, windows and length on each of the walls, also electrical points if already installed

    • 9 vuotta sitten
    1. abdullabinfaleh
      Kilpailun järjestäjä
      • 9 vuotta sitten

      It will be customized based on our requirements, nothing have been installed yet

      • 9 vuotta sitten
  • leshaqtr
    leshaqtr
    • 9 vuotta sitten

    Both, even where the machinces will be placed

    • 9 vuotta sitten
  • AvneetChandhok
    AvneetChandhok
    • 9 vuotta sitten

    u require the electrical plan or just the schedule of electrical appliances going to be used?

    • 9 vuotta sitten

Näytä lisää kommentteja

Kuinka päästä alkuun kilpailuiden kanssa

  • Ilmoita kilpailusi

    Ilmoita kilpailusi Nopeaa ja helppoa

  • Saat valtavasti töitä

    Vastaanota tonnikaupalla osallistumisia Ympäri maailmaa

  • Myönnä palkinto parhaalle työlle

    Myönnä palkinto parhaalle työlle Lataa tiedostot - Helppoa!

Ilmoita kilpailu nyt tai liity tänään!